Similar Projects
Fire Headquarters and EOC - 18177 - City of Corpus Christi
Renovation, Infrastructure
Conception
$500,000 CJ est. value
Corpus Christi, TX 78401

North Beach Area Primary Access - 18033A - City of Corpus Christi
New Construction, Infrastructure
Conception
$1,025,000 CJ est. value
Corpus Christi, TX 78409

Kram ST New Warehouses
New Construction, Infrastructure - 16,000 SF
Design
$2,275,000 CJ est. value
Corpus Christi, TX 78413

Hampton Inn Hotel / North Padre Island
New Construction, Infrastructure
Design
$25,000,000 CJ est. value
Corpus Christi, TX 78401

Bill Witt City Park Pool
New Construction, Infrastructure
Bidding
$9,500,000 CJ est. value
Corpus Christi, TX 78414

Bill Witt City Park Pool
New Construction, Infrastructure
Bidding
$9,500,000 CJ est. value
Corpus Christi, TX 78414

Utility Worksite Restoration Services
Term Contract
Post-Bid
Corpus Christi, TX

Corpus Christi North Beach Harvey Repair
Infrastructure
Post-Bid
$520,000 to $580,000 est. value
Corpus Christi, TX 78473

South Oso Parkway (South Staples Street to South Oso Parkway)
Infrastructure
Results
$1,295,485 CJ est. value
Corpus Christi, TX 78413

ESSER Funds - Canopy Structures Phase II
Infrastructure
Results
$1,522,251 CJ est. value
La Joya, TX 78560

Superior Trailer
New Construction, Infrastructure - 12,250 SF
Construction
$2,014,000 CJ est. value
Corpus Christi, TX 78406

Quick Quack Car Wash - Fancy Pant
Addition, Demolition, Build-out, Infrastructure - 4,432 SF
Construction
$300,000 CJ est. value
Corpus Christi, TX 78411

Port Aransas Hotel And Conference Center
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Port Aransas, TX 78373

Seawater Desalination Plant - E15117 - City of Corpus Christi
New Construction, Infrastructure
Pending Verification
$188,570,000 CJ est. value
Corpus Christi, TX 78401

Car Rental Ready Return Parking Lot - 23101 - City of Corpus Christi
Infrastructure
Conception
$675,000 CJ est. value
Corpus Christi, TX 78406

Last Updated 02/02/2023 09:09 AM
Project Title

North Padre Island Beach Storage Facility - E15102 - City of Corpus Christi

Physical Address View project details and contacts
City, State (County) Corpus Christi, TX 78401   (Nueces County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Misc. Recreational, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $1,700,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will construct a Parks Beach Storage Facility south of Packery Channel on City-owned property. The facility shall be constructed of block construction and painted to expunge any industrial appearance of the facility.The wash bay will be located behind the building to diminish street visibility. The building will consist of four bays for equipment storage. There will be a bathroom required by code and an equipment room to house the equipment for the wash bay. The floor drains will be connected to an oil and sand separator as required by code. This project is included in the city's 2023-2025 Capital Improvement Plan (CIP). As of February 2, 2023, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents