Similar Projects
Lakeside Plaza
Demolition, New Construction, Infrastructure - 66,738 SF
Conception
$11,000,000 CJ est. value
Bradenton, FL 34207

Lakeside Plaza
Demolition, New Construction, Infrastructure - 66,738 SF
Conception
$11,000,000 CJ est. value
Bradenton, FL 34207

Reimagining Pine Avenue Safety Improvement Project - City of Anna Maria
Infrastructure
Design
$1,360,000 CJ est. value
Anna Maria, FL 34216

Reimagining Pine Avenue Safety Improvement Project - City of Anna Maria
Infrastructure
Design
$1,360,000 CJ est. value
Anna Maria, FL 34216

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

North Water Reclamation Facility Storage Expansion
Addition, Demolition, Infrastructure
Post-Bid
$453,000 CJ est. value
Palmetto, FL 34221

Low Bid Design Build I-275 At Skyway Attenuation
Infrastructure
Results
FL

Whitfield Avenue at Prospect Road Intersection Improvements
Infrastructure
Results
Sarasota, FL 34243

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Beachway Plaza Shell / Bradenton
Addition, Demolition, Renovation, Infrastructure - 36,645 SF
Construction
$1,392,510 CJ est. value
Bradenton, FL 34209

Lakewood Ranch Multifamily Phase 2
New Construction, Infrastructure
Pending Verification
$117,000,000 CJ est. value
Bradenton, FL 34211

Lakewood Ranch Multifamily Phase 2
New Construction, Infrastructure
Pending Verification
$117,000,000 CJ est. value
Bradenton, FL 34211

Harbor Hills Water Main Replacement - 6104270 - Manatee County
Infrastructure
Conception
$3,774,000 CJ est. value
Bradenton, FL 34209

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

RFP D/B - Design-Build Services for Colony Cove Pipeline Replacements and Phase 1 Replacements
Infrastructure
Post-Bid
$300,000 CJ est. value
Bradenton, FL 34205

Last Updated 12/27/2023 05:07 PM
Project Title

59th St W from Cortez to Manatee Avenue - 6108360 - Manatee County

Physical Address View project details and contacts
City, State (County) Bradenton, FL 34209   (Manatee County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected October 2025
Bids Due View project details and contacts
Estimated Value $23,420,836 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is included in the Manatee County's fiscal years 2024-2028 Capital Improvement Plan (CIP). As of December 27, 2023, further details regarding design and construction have not been identified. A firm timeline for construction has not been established; however, funding is allotted to fiscal year 2025. A detailed scope has not yet been released. Widen the existing two lane roadway to a four lane roadway with a center left turn lane and/or median from Cortez Road to Manatee Ave (approximately 2.3 miles). The project will also include adding and upgrading pedestrian and bicycle facilities, replacing and upgrading traffic signals as needed to accommodate the widening, and adding lighting. Project will require right-of-way acquisition. Due to right-of-way constraints the improvement will not meet the County's standard typical 4-lane section. This project includes the limits of the former functional improvement project TR01455 (33rd Ave Dr W - Cortez Rd) and the former sidewalk project TR01552 (Sun Chase Apt - Cortez), both of which are no longer needed as their scope is included or made obsolete by the 6108360 project. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents