Similar Projects
Carter-Lee Park - Town of Smyrna
Infrastructure
Conception
$600,000 CJ est. value
Smyrna, TN 37167

Whataburger / Smyrna
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Smyrna, TN 37167

Patterson Park Community Center Playground
Infrastructure
Design
$300,000 CJ est. value
Murfreesboro, TN 37130

Graystone - Section 1
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
Murfreesboro, TN 37127

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Andy's Frozen Custard / Smyrna
New Construction, Infrastructure - 2,100 SF
Bidding
$800,000 CJ est. value
Smyrna, TN 37167

Water Meter Retrofit Replacement Registers
Term Contract, Infrastructure
Post-Bid
Murfreesboro, TN

Seal Coat & Striping
Infrastructure
Post-Bid
Murfreesboro, TN 37127

Rucker Lane Phase 1
Results
$2,299,947 est. value
Murfreesboro, TN 37128

Annual Asphalt Paving for the Street Department
Term Contract
Results
Smyrna, TN

RFQ Design - Construct Sleep Disorder and Specialty Clinics Design - Murfreesboro
Addition, Demolition, Infrastructure, Renovation - 18,600 SF
Pending Verification
$20,000,000 CJ est. value
Murfreesboro, TN 37129

RFQ Design - Construct Sleep Disorder and Specialty Clinics Design - Murfreesboro
Addition, Demolition, Infrastructure, Renovation - 18,600 SF
Pending Verification
$20,000,000 CJ est. value
Murfreesboro, TN 37129

Taxiway F Development And T-Hangar Construction - City of Murfreesboro
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Murfreesboro, TN 37129

MTSU Applied Engineering Building
New Construction, Infrastructure - 92,000 SF
Design
$54,900,000 CJ est. value
Murfreesboro, TN 37130

Cheatham Stoplog Concrete Storage Slab
Term Contract, Infrastructure, Alteration
Post-Bid
$1,000,000 to $5,000,000 est. value

Last Updated 02/13/2023 05:02 PM
Project Title

Cedar Stone Park North Restroom Building

Physical Address View project details and contacts
City, State (County) Smyrna, TN 37167   (Rutherford County)
Category(s) Entertainment/Recreation, Heavy and Highway, Sewer and Water
Sub-Category(s) Misc. Recreational, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $632,693 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Town of Smyrna will accept bids on the Cedar Stone Park North Restroom Building and work will include: Construction of an approximate 929 s.f. enclosed restroom building with a covered porch. The project will include grading, erosion control, water/sewer/electric utility installation, sidewalk removal, ADA accessible ramp, sidewalk, a gravity sewer main and grinder pump sewer alternative, and all other appurtenances necessary for the completion of the project. All Bidders must be licensed Contractors in the State of Tennessee in strict accordance with State regulations. All bidders shall comply with the Tennessee Contractor' License law Section 62-6-119 (Bid documents - Required disclosure by bidders) when submitting bids. Bidders may be required to obtain a Smyrna Business License. Refer to the contract documents for criteria. All bidders shall adhere to Title VI of the Civil Rights Act enacted in 1964 which states that "No person in the United States shall, on grounds of race, color, or national origin, be excluded from participation in, be denied the benefits of, or subjected to discrimination under any program or activity receiving federal financial assistance", state of Tennessee funding, and/or funded by the Town of Smyrna. In addition, the Town of Smyrna will not discriminate in the purchase of all goods and services on the basis of race, color, religion, sex, national origin, age, disability or any other lawfully protected classification. Bids may not be withdrawn for ninety (90) days after the actual date of the opening. The Town of Smyrna reserves the right to reject any and all bids, to waive technicalities or informalities and to accept any bid deemed to be in the best interest of the Town. OLG JOB # 32321

Details

929 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents