Similar Projects
Upper Harbor Terminal Park Masterplan
New Construction, Infrastructure
Conception
$5,000,000 est. value
Minneapolis, MN

Upper Harbor Terminal Park Masterplan
New Construction, Infrastructure
Conception
$5,000,000 est. value
Minneapolis, MN

Sport Courts and Site Improvements at Dickman Park
Infrastructure
Bidding
$391,370 CJ est. value
Minneapolis, MN 55413

P143 Intelligence Center
Addition, Demolition, Build-out, Renovation, Infrastructure - 9,200 SF
Post-Bid
$15,000,000 CJ est. value
Minneapolis, MN 55450

Paving Replacement and Site Improvements - Northport Elementary School
Infrastructure
Post-Bid
Brooklyn Center, MN 55429

Directional Boring
New Construction
Results
Minneapolis, MN 55401

Grading, Bituminous Surfacing, Signing, TMS, and Lighting
Results

Bhatti GI Surgery Center
Demolition, New Construction, Infrastructure - 40,032 SF
Construction
$15,000,000 CJ est. value
Minneapolis, MN 55435

Bhatti GI Surgery Center
Demolition, New Construction, Infrastructure - 40,032 SF
Construction
$15,000,000 CJ est. value
Minneapolis, MN 55435

Cornelia View Apartments
Infrastructure, Renovation
Pending Verification
$33,000,000 CJ est. value
Minneapolis, MN 55435

Cornelia View Apartments
Infrastructure, Renovation
Pending Verification
$33,000,000 CJ est. value
Minneapolis, MN 55435

Walgreens #16279 / Minneapolis
New Construction, Infrastructure - 75,000 SF
Post-Bid
$20,000,000 CJ est. value
Minneapolis, MN 55406

Grading, Bituminous Surfacing, ADA Improvements and Signal
Results
MN

Bde Maka Ska Refectory
New Construction, Infrastructure - 9,890 SF
Construction
$6,225,700 CJ est. value
Minneapolis, MN 55408

Seven Points Uptown
New Construction, Infrastructure, Renovation - 172,000 SF
Pending Verification
$150,000,000 CJ est. value
Minneapolis, MN 55408

Last Updated 03/13/2023 12:11 PM
Project Title

Willow Creek Road Culvert Improvements

Physical Address View project details and contacts
City, State (County) Eden Prairie, MN 55344   (Hennepin County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $568,433 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

he project includes replacing the existing culverts under Willow Creek Road, the work includes: removal of existing bridge and culverts, construction of sanitary sewer and storm culverts, construction of concrete headwalls, temporary bypass road, bituminous roadway and concrete curb and gutter, temporary creek conveyance, and erosion control. The work includes the furnishing of all labor and materials and all else necessary for the following: REMOVE BITUMINOUS PAVEMENT 700 SQ YD REMOVE BRIDGE 1 LS CLEARING AND GRUBBING 0.2 ACRES SELECT GRANULAR EMBANKMENT 480 CU YD STRUCTURAL CONCRETE 95 CU YD REINFORCMENT BARS 10000 LBS ORNAMENTAL METAL RAILING 80 LIN FT BITUMINOUS PAVEMENT 100 TONS CONCRETE CURB & GUTTER 260 LIN FT CLASS 5 AGGREGATE 100 CY FLOATATION CURTAIN 100 LIN FT SILT FENCE 650 LIN FT Together with numerous related items of work, all in accordance with Plans and Specifications. A. The project involves but is not limited to the removal of the Willow Creek Road Bridge and reconstruction of roadway segment. Individual elements of work shall include, but are not limited to: 1. Removal of bituminous pavement, concrete bridge slab, and driveways, pipe and other miscellaneous items. 2. Clearing and grubbing. 3. Street excavation. 4. Sanitary sewer construction. 5. Storm sewer construction. 6. Bypass pumping 7. Concrete curbing and driveway pavement construction. 8. Bituminous street construction. 9. Turf restoration and erosion control construction. 10. Traffic Control. 11. Other miscellaneous work shown on the plans or specified herein.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Bridges.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents