Similar Projects
On Call and as Needed Plumbing Services at Various Boston Public Schools West Zone
Post-Bid
Boston, MA

4 Trade Contractor Packages
Alteration
Post-Bid
$26,043,100 est. value
Boston, MA

Provide Plumbing and Systems Maintenance Services
Term Contract, Alteration
Results
$100,000 to $300,000 est. value
Braintree, MA

Magazine Beach Pool Bathhouse Renovation - Sub-Bids
Alteration
Results
$950,000 est. value
Boston, MA

Plumbing Services for the Boston Police Department
Alteration
Post-Bid
$250,000 est. value
Boston, MA

Pool Mechanical Services – DCR Pools in Metro Boston Region - Filed Sub Bids
Alteration
Results
$1,800,000 est. value

On-Call Plumbing and Heating Services
Term Contract
Post-Bid
Norwood, MA

SUST - Low Flow Toilets, Lakeview Manor 200-1
Alteration
Results
$101,700 est. value
Weymouth, MA 02189

Two Trace Contractor Packages
Alteration
Post-Bid
$15,557,060 est. value
Boston, MA

On-Call Plumbing Services
Alteration
Results
$225,000 est. value
Needham, MA

Installation of Water Bottle Refill Stations - Package 1B, Various Schools, Plumbing Only
Alteration
Post-Bid
Boston, MA

Cast Iron Waste Pipe Replacement, Hilltop Terrace 667-1
Addition
Results
$360,000 est. value
Plainville, MA 02762

Installation of Water Bottle Refill Stations -Package 1A, Various Schools, Plumbing Only
Alteration
Post-Bid
Boston, MA

On-Call Plumbing Services
Term Contract
Results
$70,000 est. value
Franklin, MA

One Trade Contractor Package: Early Plumbing for Bunker Hill Community College - New Student Success Center - Building E Renovations
Alteration
Post-Bid
$8,725,165 est. value
Boston, MA

Last Updated 10/05/2022 09:37 AM
Project Title

Pump Station Improvements Project

Physical Address View project details and contacts
City, State (County) Westwood, MA 02090   (Norfolk County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work under this contract includes providing labor, materials and equipment to upgrading the existing Clapboardtree Street Sewer Pump Station as shown in the Contract Documents. The upgrade includes but is not limited to replacing the existing submersible pumps, valves, piping and level monitoring instrumentation; select demolition; replacing the existing sewer force main with new 3-inch PVC pressure sewer pipe including a force main bypass assembly; and installing new 8-inch and 10-inch PVC gravity sewer and manholes. Work also includes site restoration including trench paving with hot mix asphalt, loam and seeding, and replacement of existing landscaping Clapboardtree Street Sewer Pump Station and Force Main Improvements Project Each bid shall be accompanied by a bid deposit in the form of a certified, bank, Treasurer's or cashier's check, or a bid bond issued by a surety company licensed by the Commonwealth of Massachusetts, in the amount of (5%) if the total bid price, made payable to the Town of Westwood All work above shall be substantially completed within 210 calendar days from the notice to proceed, and final completion within 240 calendar day. The notice to proceed is anticipated to be provided December 2022, with an anticipated mobilization of April 2022.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents