Similar Projects
2022 Taunton Water Main Improvements Project
Infrastructure
Bidding
$1,400,000 est. value
Taunton, MA

Water Mains and Appurtenances
Infrastructure
Bidding
$8,500,000 est. value
Fall River, MA

Water Meter Replacement
Infrastructure
Post-Bid
North Dighton, MA

Utilities Department Materials
Infrastructure
Post-Bid
Fall River, MA

Route 6 Pump Station Improvements and Sewer and Water Rehabilitation
Results
$1,000,000 est. value
Somerset, MA

Route 6 Pump Station Improvements and Sewer and Water Rehabilitation
Results
$920,000 est. value
Somerset, MA

On-Call Pipe Repair Contract
Infrastructure
Bidding
Taunton, MA

FY2022 Cold Water Meters
Term Contract
Post-Bid
$150,000 est. value
South Easton, MA

Installation of Approximately 8,700 Linear Feet of Eight-Inch Diameter Cement Lined Ductile Iron Water Main
Results
$2,000,000 est. value
North Attleborough, MA

Furnish and Install two 6-Inch Insertion Valves on the Water Main on Mendon Road
Infrastructure
Post-Bid
$12,800 est. value
Attleboro, MA 02703

Water Improvement Project - May Street and Lake Como Area
Results
North Attleborough, MA

Emergency Water System Interconnection Between Attleboro and Pawtucket - Sub
Infrastructure
Post-Bid
$2,700,000 est. value
Attleboro, MA

Elmwood Avenue Park Place and Lonsdale Avenue Cleaning and Lining
Results
Attleboro, MA

Vinnicum Road Raw Water Main Replacement
Infrastructure
Post-Bid
$190,000 est. value
Swansea, MA 02777

Water Main Replacement Phase 20
Infrastructure
Results
$2,200,000 est. value
Fall River, MA

Last Updated 07/06/2022 07:37 AM
Project Title

Replacing Sections of Water Transmission Main

Physical Address View project details and contacts
City, State (County) New Bedford, MA   (Bristol County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work of this project includes replacing sections of water transmission main across Massachusetts Department of Transportation (MassDOT)-owned railroad tracks at two locations: Braley Station located approximately 500-feet northwest of 10 Chipaway Road in East Freetown, MA; and Industrial Park located approximately 300-feet east of 30 Samuel Barnet Boulevard in New Bedford, MA.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents