Similar Projects
500 North - 700 East to 900 East - City of Provo
Infrastructure
Conception
Provo, UT 84601

500 North - Independence Avenue to 600 West - City of Provo
Alteration
Conception
$600,000 est. value
Provo, UT 84606

Eagle Mountain Medical Office Building
New Construction, Infrastructure - 11,434 SF
Design
$7,000,000 CJ est. value
Eagle Mountain, UT 84005

Eagle Mountain Medical Office Building
New Construction, Infrastructure - 11,434 SF
Design
$7,000,000 CJ est. value
Eagle Mountain, UT 84005

RFQ Design - Lehi City All-Abilities Park at Family Park
Infrastructure
Bidding
$500,000 CJ est. value
Lehi, UT 84043

Harvest View Park Phase 2 - Site Construction
Renovation
Post-Bid
Santaquin, UT

Engineering Building Utah Valley University
New Construction, Infrastructure
Post-Bid
$88,148,000 CJ est. value
Orem, UT 84058

Bookcliffs Pond Maintenance and Excavating
Infrastructure
Results

Foothill Boulevard Extension - Lariat to Pony Express Parkway
Infrastructure
Results
$17,036,199 CJ est. value
Saratoga Springs, UT 84045

American Fork Multifamily - Offsite Work
New Construction
Construction
American Fork, UT 84003

The Crossing
New Construction
Construction
Saratoga Springs, UT 84045

Lehi Medical Park
New Construction - 48,000 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Lehi, UT 84043

East Center Street Townhomes
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Spanish Fork, UT 84660

Center Street Arch - City of Provo
Infrastructure
Conception
$1,000,000 est. value
Provo, UT 84601

2022 Santaquin Center Street Storm Drain Improvements Project
Infrastructure
Design
$883,409 CJ est. value
Santaquin, UT 84655

Last Updated 12/29/2022 03:35 PM
Project Title

RFP Construction Manager - USDC Comprehensive Therapy Building Department of Health and Human Services

Physical Address View project details and contacts
City, State (County) American Fork, UT 84003   (Utah County)
Category(s) Heavy and Highway, Medical
Sub-Category(s) Medical Office/Outpatient, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected June 2023 , Request For Proposals, Construction documents
Bids Due View project details and contacts
Estimated Value $30,500,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This Construction Management/General Contractor (CM/GC) project includes: The Utah State Development Center (USDC) is currently in the programming phase for a proposed new facility, estimated to be around 60,000SF, to consolidate a variety of therapy services and programs which are currently spread out across campus in various buildings. The new facility will allow for easier transition of residents and staff between sessions, helping to streamline all services along with increasing direct clinician to clinician case communication, being more energy efficient and requiring less maintenance time. Therapy programs included in this new facility will include Physical Therapy, Hydrotherapy, Occupational Therapy, Life Skills Center, Recreation, Audiology, Speech, Autism Treatment and Resident Medical Services, including Dental. The site for this proposed new facility is to be in the center of the campus to enhance accessibility to the centralized therapy programs. There are currently 3 existing buildings that will require demolition prior to construction of the new facility The Fixed Contract Price Limit, as defined in the CM/GC Agreement, is: $30,500,000. For questions regarding this project, please contact DFCM Project Manager Ashley Greenwood at ajgreenwood@utah.gov or 385-522-9196.. No others are to be contacted regarding this project. The Contractor for the project must be a Utah licensed General Contractor. Association with other individuals or firms having appropriate professional expertise is acceptable. The State will enter into a single agreement with the successful Contractor. A bid bond in the amount of 5% of the Fixed Contract Price Limit, made payable to the Division of Facilities Construction and Management on an AIA Document A310 - 2010 Bid Bond form, or equivalent, shall accompany the Contractor's Cost Proposal. The Division of Facilities Construction and Management reserves the right to reject any or all proposals or to waive any formality or technicality in any proposal in the interest of the State. Deadline for Contractors to Submit Questions Prior to Submission of Proposals - Friday, November 18, 2022 3:00 PM

Details

60,000 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Wall Coverings, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving.
Division 11 - Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Collection and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Casework, Furnishings and Accessories, Seating.
Division 13 - Special Construction, Radiation Protection.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Healthcare Communications and Monitoring Systems.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents