Similar Projects
Bountiful High School Stadium Renovation
Renovation
Conception
Bountiful, UT 84010

Bell View Elementary Improvements
Renovation
Conception
Sandy, UT 84094

DFCM Construction UU Applied Sciences Building
New Construction
Design
$62,399,123 est. value
Salt Lake City, UT 84112

Remodel Portable Classrooms
Renovation
Bidding
$700,000 est. value
South Jordan, UT 84095

Elevator Upgrade, Highland High School
Renovation
Bidding
$100,000 est. value
Salt Lake City, UT 84106

Spanish Fork High School Rebuild
Post-Bid
Spanish Fork, UT 84660

Timpview High School Replacement
New Construction, Demolition - 400,000 SF
Post-Bid
$115,000,000 est. value
Provo, UT 84604

New High School - CM/GC
New Construction
Results
Less than $105,000,000 est. value
Ogden, UT 84401

Payson High School Rebuild and Maple Mountain High School Football Stadium and Track Renovation
Results
$90,000,000 est. value
Payson, UT 84651

Riverton High School Cafeteria Remodel Part II
Renovation
Construction
Riverton, UT 84065

Building F2 Partial Renovation
New Construction
Construction
Clearfield, UT 84016

Beehive Academy
New Construction - 77,584 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Draper, UT 84020

Micron Middle School Seminary
New Construction
Pending Verification
Lehi, UT 84043

New Junior High School
New Construction
Conception
$51,000,000 est. value
West Haven, UT

Bear River High School Language Arts Area Glycol Addition
Addition
Post-Bid
Garland, UT 84312

Last Updated 05/03/2022 08:35 AM
Project Title

South Summit School District Summer Construction Projects

Physical Address View project details and contacts
City, State (County) Kamas, UT 84036   (Summit County)
Category(s) Education, Laboratory, Single Trades
Sub-Category(s) Fire Protection, Laboratory, Middle/Senior High School, Windows/Doors
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description: 1.South Summit High School Agriculture Lab Remodel 2.South Summit High School Dry-Pipe Fire Sprinkler Replacement (Main Lines) 3.South Summit Middle School Door Replacement

Details

Middle/Senior High School, Renovation, Laboratory, Renovation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Furniture, Institutional Furniture, Laboratory Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Fans, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents