Similar Projects
Linda Pedersen Park Boardwalk
Infrastructure
Bidding
$614,570 est. value
Spring Hill, FL 34607

Inspection, Management, and Performance of Maintenance on All Components on and along Interstate Highway I-75 in Hillsborough, Pasco, and Hernando Counties
Post-Bid

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Brooksville Elementary - Howell Ave. from Croom Rd. to US 41/ Broad St Sidewalk - LAP Project
Results
Brooksville, FL 34601

Westside Elememtary LAP Project
Results
Less than $469,763 est. value
Spring Hill, FL

Splash Pad at Tom Varn Park
Term Contract, Infrastructure
Post-Bid
Brooksville, FL 34601

Shoal Line Boulevard Repaving, Phase I
Results
Less than $1,095,652 est. value
Weeki Wachee, FL 34607

Shoal Line Resurfacing Project, Phase II
Results
Less than $526,271 est. value
Weeki Wachee, FL 34607

Snow Hill Road and Jones Road Resurfacing Project
Results
Brooksville, FL 34601

Withlacoochee Trail
Results

Telcom Drive and Technology Drive Roadway Extension
Results
Less than $2,359,422 est. value
Brooksville, FL 34601

Road Paving Projects 2020
Results
Less than $303,061 est. value
Brooksville, FL 34601

Pheasant Avenue Area MSBU Paving Project
Results
FL

Resurfacing/Cement Concrete Re-Construction/ Drainage Improvements
Results
Less than $8,950,000 est. value
Brooksville, FL 34601

Paving Project In Withlacoochee State Forest
Results
Less than $244,444 est. value
Brooksville, FL 34601

Last Updated 12/01/2021 05:36 AM
Project Title

US 19 and Forest Oaks Boulevard Intersection Improvement

Physical Address View project details and contacts
City, State (County) Spring Hill, FL 34607   (Hernando County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $284,900
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The addition of a sidewalk, a concrete separator/island, an exclusive right-turn lane, a concrete channelization at frontage road, modification of the sidewalk curb ramps including detectable warnings, and an upgrade to all the signs and pavement markings within the project limits

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents