Similar Projects
Last Updated | 04/10/2019 08:02 AM |
Project Title | Brady Recreation Center Renovations |
Physical Address | View project details and contacts |
City, State (County) | College Park, GA 30337 (Fulton County) |
Category(s) | Entertainment/Recreation |
Sub-Category(s) | Clubhouse/Social Club |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Wayman and Bessie Brady recreation Center, 3571 Brenningham Drive, College Park, Georgia 30337. The construction project is to complete exterior renovations to include ADA ramps. 1. Building Exterior Restoration and Renovation: a. Decorative Masonry Veneers a top existing building wall around windows and entry ways along south face and west face (work terminates at west entry). 2. Building Exterior Windows Restoration and Renovation: a. 5" Masonry water table beneath window ledge along south face and west face entry 3. Building Exterior Restoration and Renovation: a. Repair and cleaning of existing brick and mortar as required. 4. Building Exterior Restoration and Renovation: a. Pilaster masonry columns w/4" thick masonry cap/wrap on front of building downspouts. 5. Exterior Stairs Renovation at Main Entry: a. Decorative Masonry Veneers a top existing cheek wall and install new 7" masonry risers and 14" masonryTreads 6. Exterior Stairs # 1 Renovation at West Entry: a. Decorative Masonry Veneers a top existing cheek wall and install new 7" masonry risers and 14" masonry Treads 7. Exterior Stairs # 2 Renovation at West Entry: a. Decorative Masonry Veneers a top existing cheek wall and install new 7" masonry risers and 14" masonry Treads 8. Exterior Retaining Walls Restoration and Renovation at Main Entry and West Entry: a. Decorative Masonry Veneers a top existing retaining wall with a 4" masonry cap. 9. Exterior Walkways, ADA Ramps, Landings. Main Entry and West Entry: a. Remove and replace existing concrete and install 5' wide and 14" masonry bands every ten(10') feet along south face and west face (work terminates at west entry). 10. Exterior Drainage Flumes: a. Provide masonry cover over existing flume anddischarge at curb. 11. ADA Ramp: a. Construct a new ADA accessible ramp with railing along the front of the building on the eastside between the existing wall and walkway along the building. 12. Exterior Improvements: a. Clearing and grading, rough grading and hauling required for all proposed work. | ||||||||||||||||||
Details |
|
||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |