Similar Projects
Last Updated | 06/12/2022 11:00 PM |
Project Title | Asbestos Abatement Contractor for Anthony Elementary Pre-K School, Old Security Building |
Physical Address | View project details and contacts |
City, State (County) | Anthony, NM (Dona Ana County) |
Category(s) | Single Trades |
Sub-Category(s) | Environmental |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $80,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work consists of furnishing all plant, labor and materials (except as indicated otherwise in specifications) and performing all work in strict accordance with the plans and specs forAsbestos Removal at the Anthony Elementary Pre-K School - Old Security Building at 609 Church Street in Anthony, New Mexico. Work shall include but not be limited to: preparation for the abatement process, asbestos removal flooring materials, and decontamination from areas shown, disposal, encapsulation under modified containment method, OSHA air monitoring and ambient air sampling. Where there is a conflict of applicable laws or this specification, Contractor shall immediately notify Owner or his representative the owners representation the industrial hygienist (IH). Remove asbestos containing materials from areas described in the Scope of Work, Drawings, Project Manual and any addendum. Contractor shall ensure that no individual is exposed to asbestos or fiberglass fibers contamination in excess of levels shown in these specifications. Contractor shall ensure that no asbestos contamination occurs outside any containment erected by Contractor. Contractor shall ensure that all asbestos waste is disposed of in accordance to these specification and all applicable laws. Contractor shall document all activities pertaining to this project in accordance with these specifications and all applicable laws. Contractor shall ensure that all special precautions, as stated in these documents, have been taken to protect cooling and heating systems, existing electrical equipment, and communication, security, fire, computer systems. Contractor shall ensure that the performance ofthis project does not interfere with the normal operations of all the tenants in the building. Gadsden Independent School District Anthony Elementary Pre-K 1.02 Project Objectives: A. 1.03 Description of Work: A. Remove asbestos from areas shown at the pre-bid conference, in the drawings, and in the specifications and addenda. Bidder shall field verify types, location, quantities, and access to ACM and any other special or unusual circumstances during the recommended pre-Bid conference. The purpose of this project is to completely remove specified asbestos flooring materials from the Old Security Building at Anthony Elementary Pre-K School located in Anthony, New Mexico as shown on the drawing |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |