Similar Projects
Wellington Library Renovation and Chiller Replacement CM
Renovation
Conception
$1,900,000 est. value
FL

Lantana Library Renovation CM
Renovation
Conception
$1,600,000 est. value
Lantana, FL

New Library and Events Center
Design
$21,000,000 est. value
Winter Park, FL 32980

Newfield - Master Plan
New Construction - 296,000 SF
Design
$10,000,000 CJ est. value
FL 34990

Veteran's Memorial Library and Women's Club Building Remodel
Renovation - 4,089 SF
Post-Bid
Less than $286,000 est. value
Saint Cloud, FL 34769

Construction Manager at Risk, Main Library Renovations
Renovation
Post-Bid
Saint Petersburg, FL

Design Build Services for East County Library
Results
Less than $10,000,000 est. value
Bradenton, FL 34211

Century and Molino Library Modifications
Results
Pensacola, FL 32502

St. Pete Beach Library Restoration
Renovation - 8,200 SF
Construction
$1,500,000 est. value
Saint Pete Beach, FL

New River Library Renovation and Addition
Renovation, Addition - 10,793 SF
Construction
$1,714,562 est. value
Holiday, FL 34690

Hudson Library Renovation
Renovation
Design
Hudson, FL

Design-Build Services For The New Doral Branch Library
New Construction
Post-Bid
$9,490,934 est. value
FL

Town of Howey-In-the-Hills Library Education Center Construction Project
Addition
Results
Howey-in-the-Hills, FL 34737

Centennial Park Library Renovation and Addition
Renovation, Addition - 150,718 SF
Construction
$2,000,000 est. value
Holiday, FL 34690

Charles Webb Wesconnett and Highlands Regional Libraries Children's Area Renovations-PQ-Vertical
Renovation
Results
Less than $1,172,800 est. value
Jacksonville, FL 32210

Reported 12/04/2019 07:26 AM
Project Title

Construction Manager at Risk Services for Canyon Branch Library

Physical Address View project details and contacts
City, State (County) Boynton Beach, FL 33472   (Palm Beach County)
Category(s) Government/Public
Sub-Category(s) Library - Public
Contracting Method Competitive Bids.
Project Status Results, Construction Start Expected second quarter 2021
Bids Due View project details and contacts
Estimated Value $12,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide Construction Management at Risk services consisting of pre-construction services, developing a Guaranteed Maximum Price (GMP), and construction of the Canyon Branch Library at 8780 West Boyton Beach Boulevard, Boyton Beach, FL 33472. The Project includes, but is not limited to: The construction of an approximately 32,000 square feet library, with a community meeting space, surface parking and site improvements. The site is on the south side of Canyon Town Center at the corner of Lyons Road and Boyton Beach Boulevard. Preliminary construction cost is estimated at $12,000,000.

Details

1 Library - Public, Approximately 32,000 SF New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Roof and Deck Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Library Equipment, Library Stack Systems, Audio-Visual Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Furniture, Institutional Furniture, Library Furniture, Book Shelves, Study Carrels, Index Card File Cabinets, Portable Audience Seating, Seat and Table Assemblies.
Division 13 - Special Construction.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents