Similar Projects
Engineering Services for the Wastewater Plant Outfall
New Construction
Results
West Haven, CT

Wastewater Treatment Plant (WWTP) Clarifier Launder Covers Project
Results
Simsbury, CT

WWTF Headworks Improvement Project
Results
Montville, CT 06382

WPC Odor Control System Improvements
Renovation
Results
Waterbury, CT

Final Clarifier 2 Spillway Lining
Renovation
Results
Fairfield, CT 06824

Water Pollution Control Facility SBR Air Diffuser Upgrades Phase 2
Renovation
Results
$1,300,000 est. value
Montville, CT

Quinebaug Valley Hatchery Energy and Water Supply System Operating Improvements
Renovation
Results
$2,979,587 to $3,293,228 est. value
Plainfield, CT 06374

Wastewater Treatment Facility Operations and Maintenance
Renovation
Post-Bid
Killingly, CT 06239

Primary Sedimentation Basin No. 1 - Scum Skimmer System Upgrade Project
Renovation
Results
$250,000 est. value
Cromwell, CT

East Hartford Water Pollution Control Facility Aeration, Do Control, and Scada Upgrades - Phase 3B
Renovation, Alteration
Post-Bid
$5,000,000 est. value
East Hartford, CT 06108

Replacement of Filter Media Supply
Renovation
Post-Bid
$140,000 CJ est. value
New Haven, CT 06510

RFQ - On-Call Consulting Engineering Services for Water Transmission, Distribution,Treatment System Upgrades,Sanitary Sewage Collection,Treatment System Upgrades Improvements
Term Contract
Conception
Danbury, CT 06810

Water System Filter Treatment - Margerie Treatment Plant
Renovation
Bidding
$90,000 CJ est. value
Danbury, CT 06811

Pumping and Mixing Improvements, Water Treatment Plant
Renovation
Bidding
$900,000 CJ est. value
Waterbury, CT 06708

Water Pollution Control Facility Digester Tank Phase #1 - Remove/Dewater, Haul and Dispose of Sludge/Solids
Renovation
Bidding
Fairfield, CT 06824

Last Updated 08/23/2022 12:35 PM
Project Title

Lake Gaillard Water Treatment Plant Clarifiers, Recycle Pump Station, and Concrete Restoration

Physical Address View project details and contacts
City, State (County) North Branford, CT 06471   (New Haven County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $3,810,610 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of August 23, 2022, this project has not yet been awarded. A timeline for award has not yet been established.** Bids for the Lake Gaillard Water Treatment Plant Clarifiers, Recycle Pump Station, and Concrete Restoration Project The project includes replacement of the existing clarifier plates, sludge rakes, motors, covers, flumes, covers, and foot bridges; replacement of the four vertical turbine recycle pumps, motors, and VFDs; improvements to the sludge pumping system including replacement of existing sludge pumps, motors, and VFDs, new piping, valves, and instrumentation; trash pump relocation; structural improvements to the filter basin; associated electrical work; and building repairs. Any contract or contracts awarded under this invitation for bids are expected to be funded in part by a loan from the DWSRF Program. Neither the State of Connecticut nor any of its Departments, agencies, or employees is or will be a party to this invitation for bids or any resulting contract. This procurement will be subject to the requirements contained in subsections (h), (j) and (o) of Section 22a-482-4 of the RCSA. Contractor is required to meet all DWSRF requirements/conditions. Contractors submitting a bid for this project shall hold a current Prequalification Certificate in the category of "Water Treatment Plants" from the State of Connecticut Department of Administrative Services (DAS). A copy of the Contractor's DAS Prequalification Certificate and Update (Bid) Statement must be submitted with the bid. Subcontractors whose subcontract exceeds $500,000 may perform installation or construction work as a subcontractor on project, provided that at the time of the bid submission, the Subcontractor shall be prequalified by DAS. This contract will be required to meet Davis-Bacon and state prevailing wage requirements and subcontracting Minority and Women's Business Enterprise (MBE/WBE) goal conditions (3.0 and 5.0 percent, respectively), per Connecticut Department of Public Health (CTDPH) funding requirements. Bidders shall be aware that this project shall be subject to the requirements of the "Use of American Iron and Steel" (AIS) provision of the Consolidated Appropriations Act of 2019 enacted as Public Law (P.L.) 116-6 on February 15, 2019. This provision requires iron and steel products used in DWSRF-funded projects to be produced in the United States.AIS requirements can be found at portal For this Pre-Bid meeting, two forms of identification will be required for each person attending. All Bidders shall complete a Confidentiality Agreement and comply with the South Central Regional Water Authority's COVID-19 Prevention Document prior to reviewing or purchasing Bid Documents and/or attending the Pre-Bid meeting. Bidders may now register on our portal Neither the South Central Connecticut Regional Water Authority nor Tighe & Bond will be responsible for full or partial sets of Bidding Documents, including any addenda, obtained from other sources. In order to perform public work, the Bidder and Subcontractors prior to award of contract shall hold or obtain such licenses as required by Connecticut State Statutes, and federal and local Laws and Regulations. The attention of bidders is called to the requirements of non-discrimination in employment practices, conditions of employment, and minimum wage rates to be paid. The South Central Connecticut Regional Water Authority will not knowingly conduct business with providers of goods or services that are known to discriminate. The South Central Connecticut Regional Water Authority encourages responses to its purchasing needs from women-owned and minority-owned business enterprises. For information concerning the proposed Work, contact Orville Kelly of South Central Connecticut Regional Water Authority at 203-401-6712 or Jennifer Reynolds of Tighe & Bond at 413-875-1606. The South Central Connecticut Regional Water Authority reserves the right to reject any or all bids pursuant to Section 16 of Connecticut Special Act No. 77-98, as amende

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents