Similar Projects
Water Treatment Plant - New Remote Radiator Installation
Alteration
Bidding
$300,000 est. value
Thomaston, CT 06787

Maintenance and Repair of HVAC Equipment
Alteration
Bidding
$500,000 est. value
Torrington, CT

Design/Build HVAC Replacement System for John B. Stanton Elementary School
Post-Bid
Norwich, CT 06360

City Hill Middle School (CHMS) Replacement of 3 AHU/CU's
Post-Bid
Naugatuck, CT 06770

Furnace Replacement
Results
Woodbury, CT 06798

Supplemental Cooling Upgrade for 911 Center
Results
Stamford, CT 06901

Installation of (3) Three Exhaust Hoods for the Metal Shop
Alteration
Bidding
$200,000 est. value
Ledyard, CT 06339

City Hill Middle School (CHMS) Replacement of Electric Duct Heaters
Post-Bid
Naugatuck, CT 06770

Cos Cob Design-Build (HVAC Replacement)
Results
$1,109,900 est. value
Cos Cob, CT 06807

Replacement of Two (2) HVAC Units at Mary Fritz Elementary School
Alteration
Bidding
$200,000 est. value
Wallingford, CT 06492

Replacement of Air Handler Units
Post-Bid
Mansfield, CT

Library HVAC
Results
$187,900 est. value
Woodbury, CT 06798

Four (4) Ductless Heat Pumps - Deer Run/Momauguin/Ferrara/EH Academy
Alteration
Bidding
$150,000 est. value
East Haven, CT

HVAC and Mechanical Products
Term Contract
Post-Bid

North Street School Gym Ductwork Modification
Results
$42,048 est. value
Greenwich, CT 06830

Reported 05/19/2022 12:00 AM
Project Title

HVAC Study, Design and Construction

Physical Address View project details and contacts
City, State (County) Thompson, CT 06277   (Tolland County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Town intends to contract with one or more design professionals to provide a complete study and design for HVAC in the Public Schools. The design effort would include evaluating different systems and associated costs and benefits. The study/design would include but not be limited to; system cost, efficiency, maintainability, applicability to facility, project delivery and schedule for the school. Preliminary schedule information (terms of service) is listed below, which shall allow for submission to the Towns Planning review/processes. Upon approval, the final design and construction would take place in accordance with agreed upon schedules.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents