Similar Projects
Augusta - Cadott Construction / CIR / Resurface
Infrastructure
Conception
$4,000,000 CJ est. value
Cadott, WI 54727

Augusta - Cadott Construction / CIR / Resurface
Infrastructure
Conception
$4,000,000 CJ est. value
Cadott, WI 54727

Hope Village
New Construction, Renovation, Infrastructure
Design
$10,000,000 CJ est. value
Chippewa Falls, WI 54729

NWC Security System Upgrade - State of Wisconsin - Department of Health Services
Infrastructure
Design
$560,000 CJ est. value
Chippewa Falls, WI 54729

Cadott Brown Street Resurfacing
Infrastructure
Bidding
$500,000 CJ est. value
Cadott, WI 54727

Cadott Brown Street Resurfacing
Infrastructure
Bidding
$500,000 CJ est. value
Cadott, WI 54727

Blacktop
Infrastructure
Post-Bid
Holcombe, WI

Roadwork
Infrastructure
Post-Bid
Bloomer, WI

Baribeau and Johnson Road Improvements
Infrastructure
Results
Cornell, WI 54732

5 Black Top Patching Areas
Infrastructure
Results
New Auburn, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Roadway Repaving Lake Wissota State Park
Infrastructure
Pending Verification
$727,350 CJ est. value
Chippewa Falls, WI 54729

Roadway Repaving Lake Wissota State Park
Infrastructure
Pending Verification
$727,350 CJ est. value
Chippewa Falls, WI 54729

WIS 178, Olson Drive Intersection - Wisconsin Department of Transportation
Infrastructure
Conception
$1,400,000 CJ est. value
Chippewa Falls, WI 54729

Last Updated 06/14/2023 06:02 PM
Project Title

STH 40, Elk Mound - Bloomer, CTH B E JCT to USH 53 - Wisconsin Department of Transportation

Physical Address View project details and contacts
City, State (County) Jim Falls, WI 54748   (Chippewa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2024
Bids Due View project details and contacts
Estimated Value $8,000,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of June 14, 2023, an engineer has been selected and this project is the design phase. A firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: Solicitation ID: NW-03 County :09 - Chippewa County, 17 - Dunn County Limit : CTH B E JCT TO USH 53 Anticipated Construction Cost: $7,000,000-$7,999,999 The pavement needs treatment to extend the service life and minor culvert/structure work The perpetuation project will resurface (no pre-mill, 3.5-in CIR, & Pave 2.75-in) of 10.86 miles from CTH BB to CTH G in Pierce County. Other items include: paving wider shoulders, shoulder rumble strips, culvert work (relay and tie joints, replacement, repair embankments, brushing ends, and cleaning), clean ditches, replace guardrail, pavement marking, and replace wings of C-47-402 over drainage and riprap at north end. Advertised Fixed Fee %: : 7.25 The fixed fee for this contract will apply an indirect cost factor of 150% to the consultant's estimated direct labor, regardless of the consultant's actual indirect rate. Interviews will not be conducted The method of contractor selection has not been determined at this time. Wis DOT - RFP Engineering - Elk Mound - Bloomer *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents