Similar Projects
Butterfly Valves for Ramona Pipeline Valve Replacement
Infrastructure
Sub-Bidding
$1,500,000 CJ est. value
San Diego, CA 92101

Rainbow CC - Kitchen Concrete Plumbing Services
Alteration
Post-Bid
$130,000 est. value
Fallbrook, CA 92028

RFQ Contractor - Hubbs Hall Plumbing and Slab Repairs - General Contractor
Renovation, Alteration - 4,000 SF
Post-Bid
$3,800,000 est. value
San Diego, CA

Industrial Water Treatment Services
Alteration
Results
$100,000 est. value
San Diego, CA

SDIA - Airport Administration Building - Plumbing
Alteration
Results
San Diego, CA 92108

RFQ Contractor - Hubbs Hall Plumbing and Slab Repairs - Plumbing Contractor
Alteration
Post-Bid
$3,800,000 est. value
San Diego, CA

Fire Admin Offices at Public Safety Center
Term Contract, Alteration
Results
$420,000 est. value
El Cajon, CA

On-call Plumbing Services
Term Contract
Post-Bid
San Diego, CA 92101

Penasquitos Pump Station Oxygenation System
Infrastructure
Results
$3,890,767 CJ est. value
San Diego, CA 92101

Helix 9 Flow Control Facility Ball Valves (30-inch Ball Valves) Rebid
Term Contract
Post-Bid
$450,000 CJ est. value
Lakeside, CA 92040

Lake Murray Improvements 2
Infrastructure
Results
$12,476,051 CJ est. value
San Diego, CA 92101

Sewer and Maintenance Hole Rehabilitation 2023 Project
Infrastructure
Post-Bid
$650,000 CJ est. value
Santee, CA 92071

RFP D/B - Egger Highlands Improv 1
Infrastructure
Results
$10,842,485 CJ est. value
San Diego, CA 92154

Eye Wash PM & Emergency Repairs
Term Contract
Post-Bid
San Diego, CA 92161

Deodar Reservoir Rehabilitation
Infrastructure
Results
$3,087,000 CJ est. value
Vista, CA 92083

Last Updated 05/15/2023 05:12 PM
Project Title

El Capitan Dam Spillway Near-Term Repair

Physical Address View project details and contacts
City, State (County) Lakeside, CA 92040   (San Diego County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $6,520,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The El Capitan Dam Spillway Near - Term Repair project includes but not limited to concrete repair to the upstream and downstream ogee spillway walls, left retaining walls, and surface of right walls exposed above debris. Concrete repair also applies to the portion of slab upstream of the ogee wall and downstream spillway slab extending down the existing shrubs. Additionally, the scope includes trimming non-native vegetation growing within 10 feet of the north side of the spillway steep chute. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% cashier's check, or a properly certified check upon some responsible bank; or an approved corporate surety bond payable to the City of San Diego for an amount of not less than 10% of the total bid amount. To be eligible for award of this contract, Prime contractor must possess the following licensing classification: A The City reserves the right to cancel the Notice Inviting Bids at any time, and further reserves the right to reject submitted Bids, without giving any reason for such action, at its sole discretion and without liability The City reserves the right to reject any or all Bids, to waive any informality or technicality in Bids received, and to waive any requirements of these specifications as to bidding procedure

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents