Similar Projects
FPL Orange Blossom Solar Energy Center
New Construction
Design
Vero Beach, FL 32968

Combined Cycle Facility
New Construction
Design
$727,000,000 est. value
Palatka, FL

Unit 5 SCR Catalyst Replacement at Mcintosh Power Plant
Post-Bid
Lakeland, FL 33801

Unit 3 Ball Mill Lifters Replacement at McIntosh Power Plant
Post-Bid
Lakeland, FL 33805

Bag and Cage Replacement for Deerhaven 2
Results
Less than $556,075 est. value
Gainesville, FL 32653

Unit #5 Combustion Turbine Inlet Filter Cartrige Replacements
Results
Lakeland, FL 33801

HCA Davie Hospital and Medical Center
New Construction - 905,330 SF
Construction
$220,000,000 est. value
Davie, FL 33328

300+ Mega-Watt Solar Farm
New Construction
Pending Verification
Daytona Beach, FL

Discovery Solar Energy Center
New Construction
Design
$100,000,000 est. value
Merritt Island, FL 329953

Central Energy Plant, (UF Main Campus)
Post-Bid
Less than $200,025,548 est. value
Gainesville, FL 326115

Kennedy Generation Station Control Room Construction Project
Results
Jacksonville, FL 32206

Solar Plant
New Construction
Design
$150,000,000 est. value
Crystal River, FL

Combustion Turbines HMI Upgrade Project
Results
Jacksonville, FL 32226

FPL Grove Solar Energy Center
New Construction
Design
Vero Beach, FL 32966

Reported 07/15/2020 12:00 AM
Project Title

Unit 5 Hot Reheat (HRH) ByPass Valve Replacement at Mcintosh Power Plant

Physical Address View project details and contacts
City, State (County) Lakeland, FL 33805   (Polk County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Power Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

To provide a turnkey service to remove the u5 hrh bypass valve body from existing piping and install the replacement valve body furnished by the owner into the piping in accordance with the specification and referenced drawings. the contractor shall provide all labor, materials, equipment, scaffolding, pipe insulation, etc. that is required to complete the work and not otherwise provided by the owner. the contractor shall have access to the area beginning on 10/3/2020. all work, including re-insulation of the affected areas, shall be complete by 11/3/2020.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, High-Performance Structural Concrete, Concrete Finishing, Specialty Placed Concrete, Precast Structural Concrete, Precast Concrete Specialties.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Access Doors and Panels, Coiling Doors and Grilles, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Safety Specialties, Emergency Aid Specialties, Fire Protection Specialties, Exterior Specialties, Security Mirrors and Domes.
Division 11 - Equipment, Parking Control Equipment, Loading Dock Equipment, Security Equipment.
Division 13 - Special Construction, Radiation Protection, Special Instrumentation, Seismic Instrumentation.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Personal Protection Systems, Electronic Detection and Alarm, Fire Detection and Alarm, Radiation Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Grading, Earthwork Methods, Soil Treatment, Soil Stabilization.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Fuel Distribution Utilities, Electrical Utilities, Electrical Utility Transmission and Distribution, Utility Substations, Utility Transformers, High-Voltage Switchgear and Protection Devices, Medium-Voltage Utility Switchgear and Protection Devices, Communications Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors, Cranes and Hoists.
Division 46 - Water and Wastewater Equipment.
Division 48 - Electrical Power Generation, Common Work Results for Electrical Power Generation, Instrumentation and Control for Electrical Power Generation, Electrical Power Generation Equipment, Electrical Power Generation Testing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts