Similar Projects
The Intersections Action Sports Facility
New Construction
Conception
Omaha, NE 68105

The Intersections Sports Fitness & Rehabilitation Facility
New Construction
Conception
Omaha, NE 68105

Columbus Harrah's Casino and Racetrack
New Construction - 40,000 SF
Design
$75,000,000 est. value
Columbus, NE 68601

Providing Concession Stand Operations at Veterans Complex
Term Contract
Post-Bid
Grand Island, NE 68803

Columbus Fieldhouse and Wellness Center Additions Project - Architectural, Landscaping, and MEP
Addition
Post-Bid
$400,000 est. value
Columbus, NE 68601

Shooting Range
New Construction
Results
McCook, NE

2021 Heartland Shooting Park Range Baffles
New Construction
Results
Grand Island, NE

Warhorse Casino And Track
New Construction, Renovation
Construction
Norfolk, NE

Lexington Veterans Pavilion at Kirkpatrick Memorial Park
Infrastructure
Construction
$1,160,000 CJ est. value
Lexington, NE 68850

New Equine Sports Complex
New Construction
Pending Verification
$4,500,000 est. value
Lincoln, NE

North Platte Horse Track and Casino
New Construction - 32,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
North Platte, NE 69101

2022 Bond - City of Norfolk
Addition, New Construction, Infrastructure, Renovation
Conception
$68,000,000 CJ est. value
Norfolk, NE 68701

James Family Conservatory Addition
Renovation, Addition
Results
Ashland, NE 68003

Horsetrack & Casino Resort
New Construction
Pending Verification
Kimball, NE

Yanney Park Pavilion
New Construction
Results
$4,200,000 est. value
Kearney, NE 68845

Last Updated 10/31/2022 01:02 PM
Project Title

Harmon Park Bathhouse Renovation

Physical Address View project details and contacts
City, State (County) Kearney, NE 68845   (Buffalo County)
Category(s) Entertainment/Recreation
Sub-Category(s) Misc. Recreational
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $220,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish all labor, tools, materials, equipment and incidentals required for construction of bathhouse renovations including removal of partial bathhouse concrete floor, floor drains, showers and installation of new floor drains, showers, shower dressing rooms, ADA water closets, paint, and work incidental thereto for HARMON PARK BATHHOUSE RENOVATION. Estimated Range $150,000-$220,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Project No. 130-E1-044-22

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents