Similar Projects
Sagebriar Planned Unit Development
New Construction, Infrastructure
Design
$200,000,000 CJ est. value
Greenwood, IN 46143

Bike and Pedestrian Facilities
Infrastructure
Bidding
$1,175,000 CJ est. value
Franklin, IN 46131

Bike and Pedestrian Facilities
Infrastructure
Bidding
$1,175,000 CJ est. value
Franklin, IN 46131

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

2021 CCMG - Full Depth Reconstruction and Mill and Overlay
Infrastructure
Post-Bid
Greenwood, IN

2021 Street Improvement Program
Results
Bargersville, IN

Paving
Infrastructure
Results
Whiteland, IN 46184

Patriot Defense Research Park - Buildings 1 & 2
New Construction, Infrastructure - 106,400 SF
Pending Verification
$57,000,000 CJ est. value
Franklin, IN 46131

Patriot Defense Research Park - Buildings 1 & 2
New Construction, Infrastructure - 106,400 SF
Pending Verification
$57,000,000 CJ est. value
Franklin, IN 46131

Johnson County Courthouse Exterior Sitework Project
Infrastructure
Bidding
$250,000 CJ est. value
Franklin, IN 46131

2021 CCMG - Thin Overlay
Infrastructure
Post-Bid
Greenwood, IN

I-70 Design-Build Added Travel Lanes and Pavement Replacement from SR-1 to IN/OH State Line
Infrastructure
Results

Construction Inspection Services US 31 in Johnson County - 1800082 - Indiana Department of Transportation
Demolition, New Construction, Infrastructure
Pending Verification
$42,044,000 CJ est. value
Franklin, IN 46131

Sugar Grove Elementary School Additions and Renovations Phase II
Addition, Demolition, Renovation, Infrastructure
Bidding
$3,000,000 CJ est. value
Greenwood, IN 46142

High School Drive Roadway Improvements
Infrastructure
Post-Bid
Edinburgh, IN 46124

Last Updated 03/31/2023 02:06 AM
Project Title

2023 Concrete Street Overlay Project

Physical Address View project details and contacts
City, State (County) Franklin, IN 46131   (Johnson County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $2,082,260 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed is described in the specifications. All Bidders must be pre-qualified by the Indiana Department of Transportation. A 10% bid bond or certified check will be required with the bid and shall be made payable to the Johnson County Board of Commissioners. A performance bond equal to the contract price and a payment bond to insure the payment of subcontractors, material suppliers, contract laborers and persons furnishing services will be required upon award of contract. No bid may be withdrawn after the scheduled time for opening bids without the written consent of the Board of County Commissioners for a period of 30 days. The Board reserves the right to reject any or all bids and to waive any or all irregularities in any or all bids. Completion by October 31, 2023 Project Mobilization Demobilization Project Traffic Maintenance Asphalt for Tack Coat Milling, Asphalt, 1.5 in HMA Surface, Type B 9.5 mm Geosynthetics for HMA Overlay over PCCP Install New ADA Ramp Ty 5 Remove and Install new sidewalk CONTRACT QUESTIONS All questions must be submitted in writing prior to 5:00 p.m. local time, Tuesday, February 21, 2023. Questions can be e-mailed to Daniel Johnston djohnston@co.johnson.in.us. A written response will be e-mailed. No questions will be answered by telephone.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents