Similar Projects
Comprehensive Infrastructure for Tampa’s Neighborhoods - Design-Build
Design
Less than $4,362,009 est. value
Tampa, FL 33602

Water Meter Replacements
Post-Bid
Jennings, FL 32053

Water System Improvements
Post-Bid
Less than $400,000 est. value
Caryville, FL 32427

Job Order Contracting Services for New Water Meter Service Installations
Term Contract
Results
Tampa, FL 33602

FFY2018 CDBG Neighborhood Revitalization Project
Results
Less than $700,000 est. value
Milton, FL

South Middle River Forcemain Crossing Design Build
Term Contract
Construction
Less than $45,000 est. value
Fort Lauderdale, FL 33301

Utility Metering
Term Contract
Post-Bid
Orlando, FL 32816

Grace Lane and Sandy Court Water Main and Roadway Improvements
Results
Orange Park, FL

450 Fire Hydrant Meter 3
Post-Bid
Homestead, FL 33030

Meter Set Installation and Exchanges
Results
$335,000 est. value
Kissimmee, FL 34741

Advanced Metering Infrastructure (AMI)
Post-Bid
Sarasota, FL 34230

Chilled Water Pipe Replacement - Dental Science Building Floors 8, 9 and 10
Results
Less than $368,000 est. value
Gainesville, FL 32610

Water Production 24" Dezurik Valves Rebuild or Repair
Post-Bid
Tampa, FL 33602

Reduced Pressure Principle Backflow Prevention Assemblies
Results
FL

Construction Services for Veranda Preserve West Phase 2 Infrastructure Improvements
Post-Bid
Port Saint Lucie, FL 34953

Last Updated 04/20/2021 11:11 AM
Project Title

West Grover Cleveland to the Peach Orchard Water Treatment Plant (WTP) Interconnect Project

Physical Address View project details and contacts
City, State (County) Homosassa, FL 34446   (Citrus County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $709,000
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Citrus County, Florida (“County”) invites interested parties to submit a Bid to provide construction services for the Grover Cleveland Blvd to the Peach Orchard Water Treatment Plant Interconnect Project including but not limited to materials and labor for the construction of a 16” water main extending along W. Grover Cleveland Boulevard. This project has been prepared as two project segments and the breakdown is listed as: East Project segment includes construction of approximately 5,200 LF of 12" PVC watermain extension to be used to loop the county public water system with fire hydrants, valves, and appurtenances along W. Grover Cleveland Blvd just East of Suncoast Parkway 2 (SR 589). This project will loop the southern end of the County’s Charles A Black water system. West Project segment includes construction of approximately 470 LF of 16" PVC watermain and 1,150 LF of 12" PVC watermain with new 8”-meter assembly and 8" ground storage tank connection along W. Grover Cleveland Blvd from West of Suncoast Parkway 2 (SR 589) to the Homosassa Special Water District (HSWD) Peach Orchard Water Treatment Plant (WTP) site and extending to the existing ground storage tank.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents