Similar Projects
Reported | 10/15/2021 12:00 AM |
Project Title | LEC Jail Gym Door Wall Conduit Trench |
Physical Address | View project details and contacts |
City, State (County) | MN (Dakota County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids. |
Project Status | Request for Quotations |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Jail Gym doors: Provide labor and material for services to saw cut wall conduit trench for card readers and lock hardware to be installed. This will include mobilization to site; includes loading all equipment into gang box and setting up a workspace within the jail hallway Each Door for the Below Listed Items at Each Door: Core Drill: Elect Plunge Cut Saw -One 1 1/4" diameter core hole through 8" thick concrete and door jamb; drill and pull core Hand Saw/Plunge Cut Saw: -One 8" x 6'10" section of raised face of block (3/8"); poly area, ribbon saw, chip, remove, and haul off of site -One 8" x 4" section of raised face of block (3/8"); ribbon saw, chip, remove, and haul off of site -One 1" x 1" trench on wall x 6'10" in center of newly chipped area; ribbon saw, chip, remove, and haul off of site -One 1" x 1" trench on wall x 8" in center of newly chipped area; ribbon saw, chip, remove, and haul off of site -One 2" x 4" pocket x 2" deep at junction of trenches; ribbon saw, chip, remove, and haul off |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |