Similar Projects
Jack Britt High School Chiller Replacement
Alteration
Bidding
Fayetteville, NC 28306

HVAC System Upgrade Phase 3 at South View Middle School
Alteration
Bidding
Hope Mills, NC 28348

Spring Lake Chiller Replacement
Post-Bid
Fayetteville, NC 28302

Removal of Thirty-Two (32) R-22 10 Seer Air Handlers in 32 Occupied Apartment Units
Post-Bid
Fayetteville, NC 28301

Anne Chesnutt Middle School and Morganton Road Elementary School, HVAC Infrastructure
Results
Fayetteville, NC 28303

Morganton Road Elementary School, Kitchen HVAC Addition and Building F HVAC Unit Replacement
Results
Fayetteville, NC 28303

T.C. Berrien Office A/C 2021
Alteration
Bidding
$2,000 to $30,000 est. value
Fayetteville, NC 28301

SPLFRC Packaged Unit Replacement
Post-Bid
Spring Lake, NC 28390

Benjamin Martin Elementary School and Ponderosa Elementary School Kitchen HVAC Additions
Results
Fayetteville, NC 28303

HVAC Upgrade at Douglas Byrd Middle School
Alteration
Bidding
Fayetteville, NC 28304

Garage Air System Repair
Alteration
Post-Bid
Fayetteville, NC

Seventy-First High School, Kitchen HVAC Addition
Results
Fayetteville, NC 28304

Douglas Byrd High School HVAC Upgrade
Alteration
Bidding
Fayetteville, NC 28304

EE Smith Science Class Rooms AC Replacement
Alteration
Post-Bid
Fayetteville, NC 28301

South View High School Admin A/C Replacement
Results
Hope Mills, NC 28348

Last Updated 11/11/2021 08:18 AM
Project Title

Howard Hall Cafe and Admin A/C Replacement

Physical Address View project details and contacts
City, State (County) Fayetteville, NC 28311   (Cumberland County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,000 to $30,000
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall remove and dispose of the one existing 10 ton condenser, air handler, and four ptact type units. The contractor shall supply and install one 10 ton heat pump condenser with matching air handler. The air handler shall have 15 KW heat strips. The system shall have a new thermostat supplied by the contractor. The contractor shall supply and install four 7,000 BTU Amana ptact units. The ptact units shall be install per manufacture install guide and shall have a concrete pad formed underneath them at least 1.5 inches thick. The contractor is responsible for enlarging the opening in the wall for the units. New conduit and power wire from the new disconnect to the new units. The new units shall match existing equipment’s Btu, voltage and phase. All duct work shall be sealed with mastic. All work will be done by code. The contractor shall be responsible for all permits and fees.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents