Similar Projects
Boyd H Anderson High School SMART Program
Renovation
Conception
$5,274,000 est. value
Fort Lauderdale, FL 33309

Cooper City HS SMART Program
Renovation
Conception
$6,413,081 est. value
Fort Lauderdale, FL 33328

School Board of Broward County’s Perry Middle School Property
Design
Miramar, FL 33025

Academic Solutions Academy Charter High School
Renovation, Addition - 22,830 SF
Design
Coral Springs, FL 33065

Construction Management at Risk Services Northeast High School New Addition and Renovation to Building 12
Renovation, Addition
Post-Bid
Oakland Park, FL 33334

J. P. Taravella High School Smart Program Renovations Project
Renovation
Post-Bid
Coral Springs, FL 33313

Sunrise Middle School - SMART Program Renovations
Renovation
Results
Less than $1,805,189 est. value
Fort Lauderdale, FL

Everglades High School - Smart Program Renovations
Renovation
Results
Less than $2,474,489 est. value
Miramar, FL 33027

Alazhar School
Addition - 19,785 SF
Construction
$1,711,950 est. value
Tamarac, FL 33068

Piper High School - Smart Program Renovations
Renovation, Term Contract
Construction
Sunrise, FL 33351

Deerfield Beach HS SMART Program
Conception
$2,902,214 est. value
Deerfield Beach, FL 33441

Mesivta of Coral Springs
Renovation - 40,712 SF
Design
Coral Springs, FL 33065

New River Middle School - Smart Program Renovations
Renovation
Results
Fort Lauderdale, FL 33024

Driftwood Middle School - Smart Program Renovations
Renovation
Construction
Less than $3,713,337 est. value
Hollywood, FL 33024

Northeast HS SMART Program
Renovation, Addition
Conception
$17,840,962 est. value
Fort Lauderdale, FL 33334

Reported 03/27/2020 09:34 AM
Project Title

William East Dandy Middle School-Smart Program Renovations

Physical Address View project details and contacts
City, State (County) Fort Lauderdale, FL 33311   (Broward County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value $2,101,196
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

• Replace the entire fire alarm system and provide missing exit signs. • Repairs to the existing aluminum covered walkways. Building 1 (Administration): Reroofing; replace air handling unit in Mechanical Room 120. Building 2: Reroofing and HVAC Equipment replacement. Building 3: Reroofing. Building 4: Reroofing and chillers replacement. Building 5: Reroofing and install missing exit signs. Building 6: Reroofing and install missing exit signs. Building 7: Reroofing and install missing exit signs. Building 8: Reroofing and install missing exit signs. Building 9: Reroofing and install missing exit signs. Building 10: Reroofing and install missing exit signs. Building 11: Reroofing and install missing exit signs. Building 12 (Group Restroom): Reroofing. Building 13 (Group Restroom): Reroofing. Building 14 (Group Restroom): Reroofing; painting of exterior soffit Building 15 (Group Restroom): Reroofing. Building 16 (Media Center): Reroofing. Building 17 (Group Restroom): Reroofing, painting of exterior soffit. Building 18 (Group Restroom): Reroofing; renovation of Female Student Restroom 311. Building 19 (School Health Center): Reroofing and install missing exit signs. Included in the Reroofing: • Provide new modified bitumen built-up roofing over existing '/.." per footsloped light weight insulated concrete. (Existing insulation value is approximately R-20 based on record drawings). • Remove abandonE9d rooftop equipment and unneeded close-up openings inthe roof deck, if any. • Correct current deficiencies in roof drainage. • Replace horizontal and vertical roofing expansion joints. • Upon removal of the existing roofing membrane, inspect the roof deck.Where found damaged or deteriorated, replace all such areas of the roof decking. • Relocate rooftop equipment currently located closer than 10 feet to the roofedge, or provide railings at the roof edge (as required by the Florida BuildingCode). • Raise the stands for rooftop equipment to provide a minimum of 24-inch clearance from the bottom of the supports to the new finished roofing surface(if and where such clearance would not be provided after the installation of the new insulation/roofing system). Where shown in drawings, provide new curbs for stand and curb-mounted rooftop equipment in order to provide a minimum height of 18 inches from the new finished roofing surface to the top of the curb. Provide hurricane tie-down straps at rooftop equipment if and where missing. • Raise existing plumbing vents as required to provide proper flashing. • Plumbing vents close to parapet walls shall be rerouted away from the parapet. • Reinforce the roof structure

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents