Similar Projects
D/B Northeast MATOC
Design
$1,000,000 to $250,000,000 est. value

Northeast Regional Construction IDIQ (MATOC)
Design
$50,000 to $80,000,000 est. value

Z--Maintenance and Repair Multiple Award Construction Contracts
Post-Bid
$25,000 to $100,000 est. value

Construction of Three New Buildings - General Construction
New Construction
Post-Bid
$2,000,000 est. value
Weatherly, PA 18255

Balistic Missile Defense (BMD) Program
Results

Y--IDIQ Multiple Award Global Contingency Construction Contract Navfac Area of Responsibility and Worldwide
Results
$25,000 to $500,000,000 est. value

Air Force Contract Augmentation Program (AFCAP) V
Post-Bid

Army Mechanical MATOC
Results
Less than $2,000,000 est. value

AFICA Air Force Contract Augmentation Program (AFCAP) IV
Post-Bid

Regional Multiple Award Construction Contract
Results
$750,000 to $2,000,000,000 est. value

Construction IDIQ
New Construction, Renovation, Demolition
Post-Bid

Z--National Cemetery Administration, Multiple Award Task Order Contract (MATOC) for North Atlantic District
Results
$250,000 to $500,000 est. value

Mobile Asset Repairs and Renovations
Renovation
Post-Bid

Northwestern Region Job Order Contracting Services
Term Contract
Results

Nationwide Prequalification
Post-Bid
$4,000,000 to $80,000,000 est. value

Last Updated 08/27/2019 11:08 AM
Project Title

White Haven Center

Physical Address View project details and contacts
City, State (County) White Haven, PA 18661   (Carbon County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method
Project Status Construction Commenced May 2019
Bids Due View project details and contacts
Estimated Value $2,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Phase 1.2 HVAC Phase 1.4 Electrical HVAC Construction (.2) Contract: 1. Hydronic heating system 2. Air Handlers, related ductwork, and fire alarm systems 3. Exhaust fans, related ductwork, and plenums. 4. Work is limited to one building at a time 5. Contractor shall have access to the full basement and half of the first floor 6. One wing of the building and half of the center core area shall be occupied during construction 7. The fire alarm system shall be active during construction. The Contractor shall take all precautions to avoid false alarms. 8. Contractor shall coordinate all shut downs of utilities with White Haven site representative (Richard Yohey (570) 443-4118) i.e., electric domestic water, steam, and hydronic heating systems. Contractor shall make request for shut down a minimum of five (5) working days prior to shut down. Exact time, date, and duration of shut down will be as directed by the White Haven site representative. 9. Contractor shall notify White Haven site representative when existing equipment is scheduled to be removed. White Haven maintenance department request removed equipment (i.e. air handlers, cabinet unit heater, etc.) be placed on loading dock for pick-up by the maintenance department. Equipment shall be removed in a manner to be re-installed. 10. Contractor shall remove radiant heat press-fit insulation valves (located in basement corridor) in a manner to allow for re-installation. Contractor shall notify White Haven site representative when valves are removed for pick-up by White Haven maintenance personnel. 11. Contractor shall coordinate with Elevator Service Co. the removal of the man door and security gate as necessary to load and unload materials, equipment, etc. from the elevator. Contractor shall field verify dimension of elevator car to determine maximum size of items that can be placed in the elevator. The posted maximum weight for the elevator is 2,000 lbs. Electrical Construction (.4) Contract: 1. Contractor shall include all labor, materials, tools, equipment, and services required to complete the various systems and other such equipment as herein after specified in items 2 through 8, or as indicated on the Drawings 2. Existing electrical equipment being removed shall be properly disposed of. Refer to drawings for additional information. 3. New branch circuits, combination motor starters, and disconnect switches, conduit, wire, etc., for hydronic pumps work. 4. New branch circuits, disconnect switches, wiring, breaker, etc., for bathroom cabinet heaters. 5. New branch circuits, disconnect switches with motor starters, circuit breakers, etc., for heat ventilators as noted on drawings. 6. Fire alarm work for new heat ventilator duct smoke detectors, remote test switches, and additional wiring as required. Mechanical Contractor shall mount sampling tubes in ductwork. Electrical Contractor shall mount duct smoke detector, housing, remote test switches, and wiring as required. 7. Branch circuits, wiring, breakers, etc., for exhaust fan work. 8. Electrical Contractor shall keep fire alarm panel operational while removing and adding new devices.
Details
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents