Similar Projects
UC Hastings McAllister Tower
Renovation - 641,000 SF
Conception
San Francisco, CA 94102

Compton Community College Student Housing
New Construction
Conception
$69,490,000 est. value
Compton, CA 90221

UC Riverside Education Building II (SOM ED II)
New Construction
Design
$84,000,000 est. value
Riverside, CA 92521

Mt San Antonio College Technology & Health Building
New Construction - 253,866 SF
Design
$10,000,000 CJ est. value
Walnut, CA 91789

Magnolia Mansion Renewal
Renovation
Bidding
$3,984,000 est. value
Stockton, Turlock, CA 95202

Magnolia Mansion Renewal
Renovation
Bidding
$3,984,000 est. value
Stockton, Turlock, CA 95202

High Desert State Prison Roof Replacement Phase I
Renovation
Sub-Bidding
$200,000 CJ est. value
Susanville, CA 96130

Access Control Intrusion Alarm & Montioring System Phase 1B
Renovation
Sub-Bidding
$971,000 CJ est. value
San Jose, CA 95135

Laney College Waterproofing Repairs - Phase III
Alteration
Post-Bid
Oakland, CA 94607

Winton Avenue New Roof
Infrastructure
Post-Bid
Hayward, CA 94544

Sheriff Admin Morgue Roof Project
Alteration
Results
$250,000 est. value
Woodland, CA 95776

National Roofing Program (NRP) - Roofing Construction Project #4
Term Contract
Results
$250,000 to $500,000 est. value
Marina, CA

Skyline Building 1 - New Creative Arts and Social Sciences Building
New Construction - 115,000 SF
Construction
$8,000,000 est. value
San Bruno, CA 94066

SMU Building
New Construction - 226,900 SF
Conception
$10,000,000 CJ est. value
Oakland, CA 94607

Roof Replacement at Various Locations
Alteration
Bidding
$200,000 est. value
Oxnard, CA

Last Updated 07/22/2022 02:34 PM
Project Title

Modesto Junior College West Campus Poultry and Swine Reroofing Project Phase 2

Physical Address View project details and contacts
City, State (County) Modesto, CA 95358   (Stanislaus County)
Category(s) Education, Single Trades
Sub-Category(s) College/University, Roofing
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $255,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Last day for submission for RFI. July 8, 2022 at 12:00 PM The engineer's estimate is $255,000.00 The project consists of the tear-off of (4) buildings in the Poultry and Swine Complex. Scope includes removal and reinstallation of existing mechanical equipment, replacement and paint of wood soffits and fascia boards. A bid bond by an admitted California surety insurer on the form provided by the District in the amount of ten percent (10%) of the total bid price, shall accompany the Bid Form and Proposal, as a guarantee that the Bidder will, within seven (7) days after the date of the Notice of Award, enter into a contract with the District for the performance of the services as stipulated in the bid. The successful Bidder shall be required to furnish a 100% Performance Bond and a 100% Payment Bond if it is awarded the contract for the Work. The successful Bidder may substitute securities for any monies withheld by the District to ensure performance under the Contract, in accordance with the provisions of section 22300 of the Public Contract Code. This Project is subject to labor compliance monitoring and enforcement by the Department of Industrial Relations pursuant to Labor Code section 1771.4 and subject to the requirements of Title 8 of the California Code of Regulations. The Contractor and all Subcontractors under the Contractor shall furnish electronic certified payroll records directly to the Labor Commissioner weekly or within (10) days of any request by the District or the Labor Commissioner. The successful bidder shall comply with all requirements of Division 2, Part 7, Chapter 1, of the Labor Code. All participants shall meet at the Modesto Junior College West Campus immediately in front of the Poultry & Swine Complex at the south gate. The pre-bid conference is expected to take approximately one hour. This conference is strongly recommended for all bidders but is not mandatory. : It is hereby understood and agreed that the work under this contract shall be completed within SIXTY (60) calendar days

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents