Similar Projects
Kearney Park - New Playground - City Of Watsonville
Infrastructure
Conception
$400,000 CJ est. value
Watsonville, CA 95076

Garfield Park Playground - c302217 - City of Santa Cruz
Infrastructure
Conception
$300,000 CJ est. value
Santa Cruz, CA 95060

Install High Friction Surface Treatment (HFST)
Infrastructure
Design
$6,923,000 CJ est. value
Los Gatos, CA 95033

Install High Friction Surface Treatment (HFST)
Infrastructure
Design
$6,923,000 CJ est. value
Los Gatos, CA 95033

Natural Bridges Apartments
New Construction, Infrastructure - 15,000 SF
Post-Bid
$6,000,000 CJ est. value
Santa Cruz, CA 95060

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

2021 Road Repair Project
Infrastructure
Results
$135,380 est. value
Capitola, CA 95010

Rail Trail Segment 7 Phase 2
Infrastructure
Results
$10,853,016 CJ est. value
Santa Cruz, CA 95060

180 Permanent Supportive Housing Project
Demolition, New Construction, Infrastructure - 49,961 SF
Pending Verification
$14,000,000 CJ est. value
Santa Cruz, CA 95060

La Madrona Mixed-Use Development
New Construction, Infrastructure - 6,600 SF
Pending Verification
$99,000,000 CJ est. value
Scotts Valley, CA 95060

Frederick Street Park Picnic Area - c302216 - City of Santa Cruz
Infrastructure
Conception
$285,000 CJ est. value
Santa Cruz, CA 95062

Santa Cruz Jeep
Demolition, New Construction, Infrastructure - 5,602 SF
Design
$1,500,000 CJ est. value
Santa Cruz, CA 95060

Overlay Existing Roadway with RHMA-G (BWC)
Infrastructure
Post-Bid
$3,790,000 est. value
CA

Laurel Glen Road PM 1.97 Storm Damage Repair Project
Infrastructure
Results
$526,087 est. value
CA

Bay Village
New Construction, Infrastructure
Pending Verification
$4,000,000 CJ est. value
Scotts Valley, CA 95066

Last Updated 03/20/2023 12:11 AM
Project Title

Wildlife Tunnel Under Highway 17 - Santa Cruz County

Physical Address View project details and contacts
City, State (County) Santa Cruz, CA 95060   (Santa Cruz County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $12,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call to construct a tunnel under Highway 17 in Santa Cruz County to make the busy route safer for both wildlife and pedestrians. The Caltrans solution, estimated to cost $12 million, has morphed in five years from a tunnel to “the most optimal design,” a 60-foot roadway bridge with an undercrossing to give large animals safe passage It’s the first stand-alone wildlife crossing planned in Caltrans District 5, which encompasses Santa Cruz, Monterey, San Luis Obispo, San Benito and Santa Barbara counties. $2 million in funding has been secured for this project. Per the owner, as of February 10, 2022, construction is scheduled to begin on February 23, 2022. ------------------------------------------------------------------------------------------------------------------------------------------------------------------- $5.4 million to build a Wildlife Undercrossing near Scotts Valley on Highway 17 at the Laurel Curve from .6 miles south of Laurel Road to .2 miles north of Laurel Road in Santa Cruz County.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents