Similar Projects
USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Water Main Improvements
Infrastructure
Post-Bid

Water Main Improvements
Infrastructure
Post-Bid

Sherwood Lane Water Main Improvements
Infrastructure
Results
Lena, IL 61048

Replace Waterline - General
Infrastructure
Results
Less than $100,000 est. value
Centralia, IL 62801

2022 High School Partial Pavement Replacement
Infrastructure
Construction
$31,450 CJ est. value
Trenton, IL 62293

Krape Park Adventure Mini Golf Course Reconstruction
Infrastructure
Bidding
$100,000 CJ est. value
Freeport, IL 61032

Six Foot Shoulder Widening Along the Existing Pavement and Improving/Flattening the Slopes and Ditch Grades.
Infrastructure
Post-Bid
Carlyle, IL

Replace the Existing Box Culvert Over Cedar Creek, 2.5 Miles North of Dakota, With a Triple Cell Box Culvert
Infrastructure
Results
IL

HMA Surface Removal and Overlay on Eastbound I-64
Infrastructure
Bidding
$200,000 CJ est. value
Damiansville, IL 62215

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Removal and Replacement of Two (2) Concrete Box Culverts
Infrastructure
Results
IL

Hoffman-Hart Redevelopment
New Construction, Renovation
Post-Bid
est. value
Centralia, IL 62801

Replace Waterline - Plumbing
Infrastructure
Results
Less than $400,000 est. value
Centralia, IL 62801

Last Updated 01/04/2023 03:34 PM
Project Title

Box Culvert Replacement on US 50

Physical Address View project details and contacts
City, State (County) Pearl City, IL 61062   (Stephenson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Box culvert replacement on US 50 over a drainage ditch, 0.5 miles east of Huey Road. Region 5 District 8 Federal Project # NHPPDH2Z(648) County(s) Clinton Key Route(s) FAP 327 Marked Route(s) US 50 Section(s) 21CR State Job #(s) C-98-098-21 PPS #(s) 8-00337-0000 Completion Date: August 02, 2022 Plus 5 Working Days Questions not accepted as of April 19, 2022 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashiers check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared not responsive, it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractors Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, April 08, 2022. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 071 - Box Culvert Replacement on US 50

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents