Similar Projects
Dagger Creek Bridge Replacement
Renovation
Design
Challis, ID

FY22 D3 Bridge Repair
Renovation, Infrastructure
Bidding
$1,000,000 to $2,500,000 est. value
Boise, ID 83716

Consultant Services for Sand Road Bridge
New Construction
Post-Bid
ID

Bridge Replacement for Minidoka County
New Construction, Renovation
Post-Bid
Acequia, ID 83350

Replacing the Existing Bridges on I-15 at MP 40.425
New Construction, Infrastructure
Results
$5,000,000 to $10,000,000 est. value
ID

Replace Four Local Bridges
New Construction, Infrastructure
Results
$5,000,000 to $10,000,000 est. value

Bridge Replacement at 500 South 100 West
New Construction, Renovation
Post-Bid
Rupert, ID 83350

South Idaho Canal Bridge
New Construction, Infrastructure
Results
$1,000,000 to $2,500,000 est. value
ID

West Fork Mink Creek Trail Bridge 7059-0.3 and 7059-1.5
Renovation
Post-Bid
Pocatello, ID

Over Snake River Bridge Repairs
New Construction, Infrastructure
Results
$500,000 to $1,000,000 est. value
ID

Re-Constructing the I-15/I-86 System IC
New Construction, Infrastructure
Post-Bid
ID

Bridge Replacement at Elizabeth Park Road
New Construction, Infrastructure
Results
$15,000,000 to $25,000,000 est. value
Kellogg, ID 83837

Sixth Street Crossing Over Paradise Creek
New Construction, Infrastructure
Post-Bid
$1,000,000 to $1,300,000 est. value
Moscow, ID

Big Wood River Bridge
New Construction, Renovation
Results
Ketchum, ID

Third River Crossing Planning and Environmental Linkage (Pel) Study
New Construction
Results

Reported 04/06/2022 12:00 AM
Project Title

Gaoa Jenkins Crossing Trail Bridge Replacement, Payette National Forest

Physical Address View project details and contacts
City, State (County) Riggins, ID 83549   (Idaho County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value $250,000 to $500,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of design, purchasing, delivering and installing a 60 foot span prefabricated steel truss trail bridge and 2 precast concrete grade beams. The site is remote and will require the use of a helicopter for transport. The contractor is responsible for coordinating the weight of the various bridge components with the available helicopter. The existing bridge will be removed. All nonnative components must be removed from the forest. Existing stringers will be left on site but moved from across the river as directed by the COR. All work shall be in compliance with the contract documents. Work includes, but is not limited to: purchase, transportation, and installation of a new pedestrian/stock/2 wheel motorized bridge, grade beams, and approaches as per the attached plans, and the removal of the existing bridge structure and components. The Contracting Officers Representative (COR) will designate a staging/laydown/assembly area at the construction site. Limited camping for project personnel will be allowed at the site with permission of the COR. Staging of materials for the project will be allowed in designated areas inside the project boundary if approved in writing by the COR at the time of the project implementation. The Jenkins Crossing Bridge spans French Creek on the Payette National Forest, approximately 25 miles North of McCall Idaho. Coordinates are Lat 45.2850 Long -116.0448. Access to the site is limited to two wheel motorized, hiking, or pack stock by trail. The bridge will have to be flown in.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents