Similar Projects
Dar Alnoor Expansion
Renovation, Addition - 76,276 SF
Conception
Manassas, VA 20122

Design-Build Project - William Byrd High School Renovation
New Construction, Renovation - 113,500 SF
Post-Bid
$15,000,000 to $20,000,000 est. value
Vinton, VA 24179

Renovation of School Based Health Care Clinic
Renovation - 1,185 SF
Post-Bid
Petersburg, VA

Elkhardt-Thompson (Hull Street) Middle School Project
New Construction - 170,600 SF
Results
$50,000,000 est. value
Richmond, VA

Replace HVAC and Remodel Front Offices at Grafton HS and MS
Results
Yorktown, VA 23692

Stonewall Middle School Addition and Renovations
Renovation, Addition - 41,024 SF
Construction
$17,100,000 est. value
Manassas, VA

Henley Middle School Modernization and Security Addition
Renovation, Addition - 11,400 SF
Construction
$1,250,000 to $1,900,000 est. value
Crozet, VA 22932

PPEA for Design-Build of New High School
New Construction
Results
South Boston, VA 24592

New Pulaski County Middle School Construction
New Construction - 163,350 SF
Construction
$47,000,000 est. value
Pulaski, VA 24301

Douglass High School Renovation
Renovation - 42,000 SF
Results
Leesburg, VA 20176

Construction of a New Operations Center for Suffolk Public Schools
New Construction
Construction
$17,000,000 est. value
Suffolk, VA

Original Mount Vernon High School Renovation and Adaptive Reuse
Renovation
Results
$55,000,000 est. value
Alexandria, VA 22309

Construction New Manchester Middle School
New Construction - 139,011 SF
Construction
Richmond, VA

Modular Relocation Project at Bryant High School
Results
Alexandria, VA 22306

Robert E. Aylor Middle School Replacement Project
New Construction - 147,355 SF
Construction
$48,700,000 est. value
Stephens City, VA 22655

Last Updated 05/21/2021 06:34 AM
Project Title

Serving Line Renovation at Osbourn High School

Physical Address View project details and contacts
City, State (County) Manassas, VA 20110   (Manassas City County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of a renovation of the existing serving line area for Osbourn High School. The project involves demolition of existing quarry tile flooring; removal of existing ceiling tile and grid, light fixtures, mechanical components; removal and replacement of existing wall mounted fixtures and accessories; and removal and replacement of existing serving line equipment. New work includes new floor and wall tile, new ceiling tile, light fixtures, MEP equipment, and new serving line equipment. The Contractor shall furnish all labor, equipment, materials, facilities, and management services necessary to accomplish the project requirements. For the full extent of the scope of the project reference the attached project manual and drawings. See Instructions to Bidders. The intent of the project is to upgrade the kitchen serving line equipment, interior finishes, and MEP systems.

Details

Middle/Senior High School, Approximately 1,574 SF Renovation.
Division 01 - General Requirements.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 09 - Finishes.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories, Toilet Accessories.
Division 11 - Equipment, Foodservice Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents