Similar Projects
2022 ADA Handicap Ramps, Curb and Sidewalk Improvements
Infrastructure
Bidding
Hokendauqua, PA

Mountain Bike Trail Construction
Infrastructure
Bidding
Allentown, PA

Cedar Creek Parkway West - Phase 2 Development Project
Results
Allentown, PA 18104

South Bethlehem Corridor Connections
Results
$200,000 to $499,999 est. value
Bethlehem, PA

Coopersburg Streetscape Phase 4
Results
$2,500,000 to $4,999,999 est. value
Coopersburg, PA

2021 Curb and Concrete Contractor
Results
$30,000 to $40,000 est. value
Emmaus, PA 18049

2021 Handicap Ramps, Curb and Sidewalk Improvements
Results
Fullerton, PA 18052

2021 11 Street Overlay and Curb Ramps
Results
$600,000 to $800,000 est. value
Bethlehem, PA

2021 CDBG ADA Pedestrian Ramp Program (Various Locations)
Infrastructure
Results
Allentown, PA

Parkway Manor Elementary School Student Drop-Off Improvements
Infrastructure
Results
Allentown, PA 18104

Parking Lot at N. 7th Street and N. Penn Street
Infrastructure
Results
Allentown, PA 18102

2020 CDBG East Church Street and ADA Improvements
Infrastructure
Results
Slatington, PA 18080

Allentown Jordan Creek Greenway Trail
Infrastructure
Results
$2,500,000 to $4,999,999 est. value
Allentown, PA

2021 Curb and Sidewalk Work for the 2022 Streets Program (Various Locations)
Infrastructure
Results
Allentown, PA

Pedestrian Trail Construction Work
Infrastructure
Results
Fogelsville, PA

Reported 03/17/2022 12:00 AM
Project Title

2022 ADA Pedestrian Ramp Program

Physical Address View project details and contacts
City, State (County) Allentown, PA   (Lehigh County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The materials and construction of curbing, sidewalk and street paving and to the entire satisfaction of the Contract Administrator. It is anticipated that approximately 350 ramps / truncated dome panels will need to be installed.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents