Similar Projects
Surfacing/Roadway Restoration Highway:IH410
Bidding
Less than $23,600,072 est. value
TX

Highway Improvement Highway:VA
Bidding
Less than $1,084,790 est. value
TX

2019 Street Maintenance Contract
Post-Bid
China Grove, TX 78263

Ring Road Bent Repairs
Post-Bid
Less than $189,365 est. value
San Antonio, TX

Blanco Road Phase II
Results
$19,200,000 est. value
San Antonio, TX 78207

Southern Region Disaster Recovery Support BPA
Results

Upper Leon Creek-Government Canyon Regional Rswf
Bidding
Less than $7,410,378 est. value
San Antonio, TX 78205

Oakwell Farms 2019 Trail Reconstruction
Post-Bid
San Antonio, TX

Repair Stanley Road
Results
$1,000,000 to $5,000,000 est. value
San Antonio, TX 78234

2021-2022 Task Order Contract for Pavement Markings, Package A
Bidding
$3,500,000 est. value
San Antonio, TX

2019 Oakwell Farms Mill and Overlay Phase I
Post-Bid
Less than $420,000 est. value
TX

2018 Street Preservation and Maintenance Project
Results
Schertz, TX

2021-2022 Task Order Contract for Pavement Markings, Package B
Bidding
$3,500,000 est. value
San Antonio, TX

2020 Street Improvements Phase II Eaglecrest Boulevard
Post-Bid
Windcrest, TX 78239

Converse Greenway Trail Phase 1
Results
Converse, TX 78109

Last Updated 04/08/2021 06:31 AM
Project Title

SL1604 - Widen Road - Add Lanes

Physical Address View project details and contacts
City, State (County) TX   (Bexar County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $165,766,591
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

100 6002 Preparing Row Sta 289.000 1 105 6045 Removing Stab Base And Asph Pav (2"-8") Sy 7,590.000 2 105 6094 Removing Stab Base & Asph Pav(12"-27") Sy 79,271.000 3 110 6001 Excavation (Roadway) Cy 123,888.000 4 132 6005 Embankment (Final)(Ord Comp)(Ty c) Cy 343,983.000 5 160 6003 Furnishing And Placing Topsoil (4") Sy 193,675.000 6 162 6002 Block Sodding Sy 33,749.000 7 164 6039 Drill Seeding (Perm) (Urban) (Clay) Sy 160,820.000 8 164 6051 Drill Seed (Temp)(Warm Or Cool) Sy 160,820.000 9 168 6001 Vegetative Watering Mg 3,035.200 10 169 6001 Soil Retention Blankets (Cl 1) (Ty a) Sy 160,820.000 11 247 6475 Fl Bs (Cip)(Ty d Gr 1-2, Or 5)Final Pos Cy 94,643.000 12 310 6027 Prime Coat(Mc-30 Or Ae-p) Gal 59,208.000 13 351 6004 Flexible Pavement Structure Repair(8") Sy 5,000.000 14 354 6020 Plane Asph Conc Pav(0" To 1") Sy 11,379.000 15 354 6023 Plane Asph Conc Pav(0" To 4") Sy 4,123.000 16 354 6045 Plane Asph Conc Pav (2") Sy 711,291.000 17 360 6005 Conc Pvmt (Cont Reinf - Crcp) (11") Sy 4,666.000 18 400 6001 Struct Excav Cy 21,228.000 19 400 6005 Cem Stabil Bkfl Cy 17,258.000 20 400 6006 Cut & Restoring Pav Sy 1,910.000 21 401 6001 Flowable Backfill Cy 436.000 22 402 6001 Trench Excavation Protection Lf 22,509.000 23 403 6001 Temporary Spl Shoring Sf 115,545.000 24 410 6001 Soil Nail Anchors Lf 89,104.000 25 416 6001 Drill Shaft (18 In) Lf 1,715.000 26 416 6004 Drill Shaft (36 In) Lf 12,704.000 27 416 6006 Drill Shaft (48 In) Lf 4,479.000 28 416 6007 Drill Shaft (54 In) Lf 1,154.000 29 416 6008 Drill Shaft (60 In) Lf 1,252.000 30 416 6010 Drill Shaft (72 In) Lf 267.000 31 416 6021 Drill Shaft (Sign Mts) (42 In) Lf 1,299.000 32 416 6025 Drill Shaft (High Mast Pole) (54 In) Lf 176.000 33 416 6026 Drill Shaft (High Mast Pole) (60 In) Lf 887.000 34 416 6029 Drill Shaft (Rdwy Ill Pole) (30 In) Lf 20.000 35 416 6032 Drill Shaft (Trf Sig Pole) (36 In) Lf 13.000 36 416 6034 Drill Shaft (Trf Sig Pole) (48 In) Lf 22.000 37 416 6038 Drill Shaft (108 In) Lf 594.000 38 416 6047 Drill Shaft (96 In) Lf 27.000 39 416 6051 Drill Shaft (120 In) Lf 39.000 40 420 6003 Cl a Conc (Misc) Sy 394.000 41 420 6007 Cl a Conc (Flume) Cy 550.000 42 420 6010 Cl a Conc (Plug) Ea 60.000 43 420 6013 Cl c Conc (Abut) Cy 296.800 44 420 6019 Cl c Conc (Abut)(Extend) Cy 1,160.400 45 420 6029 Cl c Conc (Cap) Cy 1,364.600 46 420 6031 Cl c Conc (Cap)(Mass) Cy 4,473.100 47 420 6037 Cl c Conc (Column) Cy 2,798.400 48 420 6039 Cl c Conc (Column)(Mass) Cy 3,239.900 49 420 6043 Cl c Conc (Footing) Cy 288.000 50 420 6045 Cl c Conc (Footing)(Mass) Cy 2,061.400 51 420 6066 Cl c Conc (Rail Foundation) Cy 7,212.000 52 420 6084 Cl f Conc (Cap)(Mass) Cy 415.900 53 420 6092 Cl f Conc (Column)(Mass) Cy 548.600 54 420 6100 Cl f Conc (Footing)(Mass) Cy 351.200 55 422 6001 Reinf Conc Slab Sf 405,968.000 56 422 6003 Reinf Conc Slab (Extend Slab) Sf 270,173.000 57 422 6013 Bridge Sidewalk Sf 3,115.000 58 422 6015 Approach Slab Cy 423.100 59 422 6035 Approach Slab (Extend) Cy 4,937.500 60 422 6036 Approach Slab (Mod) Cy 32.100 61 423 6001 Retaining Wall (Mse) Sf 110,188.000 62 423 6003 Retaining Wall (Temp Wall) Sf 81,030.000 63 423 6022 Retaining Wall (Soil Nail)(Facia) Sf 27,762.000 64 423 6040 Retaining Wall (Mse) (Special) Sf 129,351.000 65 423 6041 Retaining Wall (Soil Nail)(Facia)(Spcl) Sf 27,868.000 66 425 6015 Prestr Conc Deck Slab Beam (8ds20) Lf 945.760 67 425 6035 Prestr Conc Girder (Tx28) Lf 2,715.220 68 425 6036 Prestr Conc Girder (Tx34) Lf 10,243.880 69 425 6037 Prestr Conc Girder (Tx40) Lf 1,145.880 70 425 6038 Prestr Conc Girder (Tx46) Lf 26,808.230 71 425 6039 Prestr Conc Girder (Tx54) Lf 41,015.440 72 425 6041 Prestr Conc Girder (Tx70) Lf 1,304.610 73 429 6001 Conc Str Repair(Clean & Coat Wth Epoxy) Sf 1.000 74 429 6002 Conc Str Repair (Epoxy Mortar) Sf 18.000 75 429 6007 Conc Str Repair (Vertical & Overhead) Sf 31.000 76 429 6009 Conc Str Repair (Standard) Sf 58.000 77 432 6001 Riprap (Conc)(4 In) Cy 5,514.000 78 432 6002 Riprap (Conc)(5 In) Cy 1,244.000 79 432 6006 Riprap (Conc)(Cl b) Cy 7.500 80 432 6033 Riprap (Stone Protection)(18 In) Cy 113.000 81 432 6045 Riprap (Mow Strip)(4 In) Cy 595.800 82 438 6004 Cleaning And Sealing Exist Joints(Cl7) Lf 461.000 83 442 6007 Str Steel (Misc Non - Bridge) Lb 1,353.000 84 450 6023 Rail (Ty Sstr) Lf 66,091.800 85 450 6030 Rail (Ty c221) Lf 427.400 86 450 6052 Rail (Handrail)(Ty f) Lf 1,555.000 87 450 6054 Rail (Ty Sstr) (w/Drain Slots) Lf 25,715.000 88 450 6103 Rail (Ty Pr11) Lf 4,436.000 89 451 6024 Retrofit Rail (Ty Sstr) Lf 1,664.900 90 451 6031 Retrofit Rail (Ty c221) Lf 510.000 91 454 6004 Armor Joint (Sealed) Lf 193.000 92 454 6008 Header Type Expansion Joint Cf 62.000 93 454 6009 Joint Sealant Lf 370.000 94 454 6018 Sealed Expansion Joint (4 In) (Sej - m) Lf 3,421.000 95 454 6019 Sealed Expansion Joint (5 In) (Sej - m) Lf 1,513.000 96 459 6002 Gabion Mattresses (Galv) Cy 527.000 97 459 6009 Gabions (3' x 3')(Galv) Cy 37.000 98 462 6001 Conc Box Culv (3 Ft x 2 Ft) Lf 1,900.000 99 462 6002 Conc Box Culv (3 Ft x 3 Ft) Lf 1,470.000 100 462 6003 Conc Box Culv (4 Ft x 2 Ft) Lf 838.000 101 462 6004 Conc Box Culv (4 Ft x 3 Ft) Lf 898.000 102 464 6001 Rc Pipe (Cl Iii)(12 In) Lf 613.000 103 464 6003 Rc Pipe (Cl Iii)(18 In) Lf 627.000 104 464 6005 Rc Pipe (Cl Iii)(24 In) Lf 14,420.000 105 464 6007 Rc Pipe (Cl Iii)(30 In) Lf 1,753.000 106 464 6008 Rc Pipe (Cl Iii)(36 In) Lf 2,348.000 107 464 6017 Rc Pipe (Cl Iv)(18 In) Lf 218.000 108 464 6018 Rc Pipe (Cl Iv)(24 In) Lf 1,709.000 109 464 6019 Rc Pipe (Cl Iv)(30 In) Lf 1,045.000 110 464 6020 Rc Pipe (Cl Iv)(36 In) Lf 996.000 111 465 6002 Manh (Compl)(Prm)(48in) Ea 26.000 112 465 6003 Manh (Compl)(Prm)(60in) Ea 5.000 113 465 6005 Jctbox(Compl)(Pjb)(3ftx3ft) Ea 19.000 114 465 6006 Jctbox(Compl)(Pjb)(4ftx4ft) Ea 17.000 115 465 6009 Jctbox(Compl)(Pjb)(5ftx5ft) Ea 6.000 116 465 6011 Jctbox(Compl)(Pjb)(6ftx6ft) Ea 1.000 117 465 6012 Jctbox(Compl)(Pjb)(8ftx8ft) Ea 2.000 118 465 6015 Inlet (Compl)(Pco)(3ft)(Right) Ea 2.000 119 465 6016 Inlet (Compl)(Pco)(3ft)(Both) Ea 5.000 120 465 6018 Inlet (Compl)(Pco)(4ft)(Left) Ea 7.000 121 465 6019 Inlet (Compl)(Pco)(4ft)(Right) Ea 2.000 122 465 6020 Inlet (Compl)(Pco)(4ft)(Both) Ea 2.000 123 465 6031 Inlet (Compl)(Pcu)(3ft)(Right) Ea 2.000 124 465 6045 Inlet (Compl)(Pmbd)(4ft) Ea 102.000 125 465 6046 Inlet (Compl)(Pmbd)(5ft) Ea 2.000 126 465 6070 Inlet (Compl)(Psl)(Rc)(3ftx3ft) Ea 4.000 127 465 6071 Inlet (Compl)(Psl)(Rc)(4ftx4ft) Ea 5.000 128 465 6074 Inlet (Compl)(Psl)(Rc)(5ftx5ft) Ea 16.000 129 465 6076 Inlet (Compl)(Psl)(Rc)(6ftx6ft) Ea 2.000 130 465 6160 Inlet(Compl)(Pazd)(Fg)(4ftx4ft-4ftx4ft) Ea 42.000 131 465 6162 Inlet(Compl)(Pazd)(Fg)(5ftx5ft-4ftx4ft) Ea 5.000 132 465 6179 Inlet (Compl)(Ty Mse2) Ea 32.000 133 465 6338 Inlet (Compl)(Armor Curb Slot) Ea 3.000 134 466 6172 Wingwall (Pw - 1) (Hw=11 Ft) Ea 1.000 135 467 6007 Set (Ty i) (24 In) (6: 1) (c) Ea 1.000 136 467 6142 Set (Ty i)(s= 4 Ft)(Hw= 3 Ft)(6:1) (p) Ea 1.000 137 467 6388 Set (Ty Ii) (24 In) (Rcp) (3: 1) (c) Ea 2.000 138 467 6394 Set (Ty Ii) (24 In) (Rcp) (6: 1) (c) Ea 1.000 139 467 6395 Set (Ty Ii) (24 In) (Rcp) (6: 1) (p) Ea 4.000 140 467 6423 Set (Ty Ii) (30 In) (Rcp) (6: 1) (p) Ea 2.000 141 467 6449 Set (Ty Ii) (36 In) (Rcp) (3: 1) (p) Ea 2.000 142 467 6450 Set (Ty Ii) (36 In) (Rcp) (4: 1) (c) Ea 1.000 143 467 6454 Set (Ty Ii) (36 In) (Rcp) (6: 1) (p) Ea 2.000 144 471 6007 Grate And Frame (Bridge Drain) Ea 78.000 145 479 6001 Adjusting Manholes Ea 1.000 146 479 6006 Adjusting Inlet (Cap) Ea 8.000 147 480 6001 Clean Exist Culverts Ea 8.000 148 481 6013 Pipe (Pvc) (Sch 40) (6 In) Lf 2,327.000 149 481 6014 Pipe (Pvc) (Sch 40) (8 In) Lf 2,643.000 150 496 6010 Remov Str (Bridge 100 - 499 Ft Length) Ea 4.000 151 500 6001 Mobilization Ls 1.000 152 502 6001 Barricades, Signs And Traffic Handling Mo 38.000 153 506 6002 Rock Filter Dams (Install) (Ty 2) Lf 1,583.000 154 506 6003 Rock Filter Dams (Install) (Ty 3) Lf 775.000 155 506 6011 Rock Filter Dams (Remove) Lf 2,358.000 156 506 6020 Construction Exits (Install) (Ty 1) Sy 1,443.000 157 506 6024 Construction Exits (Remove) Sy 1,443.000 158 506 6030 Backhoe Work (Erosion & Sedmt Cont) Hr 162.000 159 506 6034 Construction Perimeter Fence Lf 1,099.000 160 506 6038 Temp Sedmt Cont Fence (Install) Lf 19,083.000 161 506 6039 Temp Sedmt Cont Fence (Remove) Lf 19,083.000 162 506 6041 Biodeg Erosn Cont Logs (Instl) (12") Lf 10,113.000 163 506 6043 Biodeg Erosn Cont Logs (Remove) Lf 10,113.000 164 508 6003 Constructing Detours (Ty 1) Sy 2,507.000 165 508 6004 Constructing Detours (Ty 2) Sy 7,421.000 166 512 6001 Port Ctb (Fur & Inst)(Sgl Slope)(Ty 1) Lf 53,400.000 167 512 6009 Port Ctb (Fur & Inst)(Low Prof)(Ty 1) Lf 34,060.000 168 512 6010 Port Ctb (Fur & Inst)(Low Prof)(Ty 2) Lf 1,060.000 169 512 6025 Port Ctb (Move)(Sgl Slp)(Ty 1) Lf 210,080.000 170 512 6033 Port Ctb (Move)(Low Prof)(Ty 1) Lf 55,340.000 171 512 6034 Port Ctb (Move)(Low Prof)(Ty 2) Lf 1,480.000 172 512 6049 Port Ctb (Remove)(Sgl Slp)(Ty 1) Lf 16,980.000 173 512 6057 Port Ctb (Remove)(Low Prof)(Ty 1) Lf 34,060.000 174 512 6058 Port Ctb (Remove)(Low Prof)(Ty 2) Lf 1,060.000 175 514 6001 Perm Ctb (Sgl Slope) (Ty 1) (42 ) Lf 10,973.000 176 514 6003 Perm Ctb (Sgl Slope) (Ty 3) (42 ) Lf 2,064.000 177 514 6005 Perm Ctb (Sgl Slope) (Ty 1) (48 ) Lf 4,265.000 178 514 6007 Perm Ctb (Sgl Slope) (Ty 3) (48 ) Lf 750.000 179 528 6001 Colored Textured Conc (4") Sy 30,364.000 180 529 6001 Conc Curb (Ty i) Lf 11,476.000 181 529 6002 Conc Curb (Ty Ii) Lf 189.000 182 529 6008 Conc Curb & Gutter (Ty Ii) Lf 115.000 183 529 6015 Conc Curb (Ty c1) Lf 114.000 184 529 6016 Conc Curb (Ty f1) Lf 445.000 185 529 6018 Conc Curb (Ty f3) Lf 4,437.000 186 529 6027 Conc Curb (Ty c2) Lf 1,071.000 187 530 6004 Driveways (Conc) Sy 1,664.000 188 530 6005 Driveways (Acp) Sy 288.000 189 531 6001 Conc Sidewalks (4") Sy 23,497.000 190 531 6003 Conc Sidewalks (6") Sy 1,214.000 191 531 6004 Curb Ramps (Ty 1) Ea 17.000 192 531 6005 Curb Ramps (Ty 2) Ea 4.000 193 531 6013 Curb Ramps (Ty 10) Ea 9.000 194 531 6016 Curb Ramps (Ty 21) Ea 1.000 195 531 6017 Curb Ramps (Ty 22) Ea 1.000 196 540 6001 Mtl w-Beam Gd Fen (Tim Post) Lf 2,450.000 197 540 6006 Mtl Beam Gd Fen Trans (Thrie-Beam) Ea 11.000 198 540 6016 Downstream Anchor Terminal Section Ea 9.000 199 542 6001 Remove Metal Beam Guard Fence Lf 22,670.000 200 542 6003 Remove Downstream Anchor Terminal Ea 60.000 201 542 6004 Rm Mtl Bm Gd Fence Trans (Thrie-Beam) Ea 56.000 202 543 6001 Cable Barrier System (Tl-3) Lf 4,702.000 203 543 6019 Cable Barrier Terminal Section (Tl-3) Ea 2.000 204 543 6021 Remove Cable Barrier Lf 3,758.000 205 543 6022 Remove Cable Barrier Terminal Section Ea 8.000 206 544 6001 Guardrail End Treatment (Install) Ea 19.000 207 544 6003 Guardrail End Treatment (Remove) Ea 76.000 208 545 6003 Crash Cush Atten (Move & Reset) Ea 78.000 209 545 6005 Crash Cush Atten (Remove) Ea 25.000 210 545 6006 Crash Cush Atten (Instl)(l)(n)(Tl2) Ea 4.000 211 545 6007 Crash Cush Atten (Instl)(l)(n)(Tl3) Ea 13.000 212 545 6019 Crash Cush Atten (Instl)(s)(n)(Tl3) Ea 27.000 213 550 6015 Remove And Install Existing Gate Ea 4.000 214 556 6006 Pipe Underdrains (Ty 6) (6") Lf 638.000 215 610 6008 Remove Rd Il Asm (Ctb Mount) Ea 29.000 216 610 6009 Remove Rd Il Asm (Trans-Base) Ea 91.000 217 610 6104 In Rd Il (u/p) (Ty 1) (150w Eq) Led Ea 106.000 218 610 6289 In Rd Il (Ty Sa) 50t-10-10(400w Eq)Led Ea 2.000 219 613 6003 Hi Mst Il Pole (125 Ft)( 80 Mph) Ea 6.000 220 613 6005 Hi Mst Il Pole (150 Ft)( 80 Mph) Ea 4.000 221 613 6007 Hi Mst Il Pole (175 Ft)( 80 Mph) Ea 20.000 222 618 6023 Condt (Pvc) (Sch 40) (2") Lf 28,281.000 223 618 6029 Condt (Pvc) (Sch 40) (3") Lf 2,340.000 224 618 6031 Condt (Pvc) (Sch 40) (3") (Conc Encse) Lf 44,580.000 225 618 6046 Condt (Pvc) (Sch 80) (2") Lf 1,982.000 226 618 6047 Condt (Pvc) (Sch 80) (2") (Bore) Lf 8,821.000 227 618 6053 Condt (Pvc) (Sch 80) (3") Lf 4,873.000 228 618 6054 Condt (Pvc) (Sch 80) (3") (Bore) Lf 13,576.000 229 618 6062 Condt (Rm) (3/4") Lf 2,161.000 230 618 6074 Condt (Rm) (3") Lf 1,220.000 231 620 6002 Elec Condr (No.14) Insulated Lf 34,320.000 232 620 6005 Elec Condr (No.10) Bare Lf 3,596.000 233 620 6006 Elec Condr (No.10) Insulated Lf 7,192.000 234 620 6007 Elec Condr (No.8) Bare Lf 17,358.000 235 620 6008 Elec Condr (No.8) Insulated Lf 45,926.000 236 620 6009 Elec Condr (No.6) Bare Lf 26,833.000 237 620 6010 Elec Condr (No.6) Insulated Lf 29,995.000 238 620 6011 Elec Condr (No.4) Bare Lf 3,090.000 239 620 6012 Elec Condr (No.4) Insulated Lf 9,395.000 240 620 6016 Elec Condr (No.2) Insulated Lf 4,200.000 241 621 6005 Tray Cable (4 Condr) (12 Awg) Lf 1,978.000 242 624 6001 Ground Box Ty a (122311) Ea 62.000 243 624 6002 Ground Box Ty a (122311)w/Apron Ea 94.000 244 624 6010 Ground Box Ty d (162922)w/Apron Ea 41.000 245 624 6028 Remove Ground Box Ea 302.000 246 628 6002 Remove Electrical Services Ea 25.000 247 628 6076 Elc Srv Ty a 240/480 100(Ns)Ss(e)Sp(o) Ea 8.000 248 628 6151 Elc Srv Ty d 120/240 060(Ns)Ss(n)Ps(u) Ea 1.000 249 628 6152 Elc Srv Ty d 120/240 060(Ns)Ss(n)Sp(o) Ea 6.000 250 628 6249 Elc Srv Ty d 120/240 100(Ns)Ss(n)Ps(u) Ea 1.000 251 628 6250 Elc Srv Ty d 120/240 100(Ns)Ss(n)Sp(o) Ea 3.000 252 636 6002 Aluminum Signs (Ty g) Sf 397.000 253 636 6003 Aluminum Signs (Ty o) Sf 10,026.000 254 636 6008 Replace Existing Aluminum Signs(Ty g) Sf 5.000 255 644 6001 In Sm Rd Sn Sup&Am Ty10bwg(1)Sa(p) Ea 44.000 256 644 6004 In Sm Rd Sn Sup&Am Ty10bwg(1)Sa(t) Ea 121.000 257 644 6007 In Sm Rd Sn Sup&Am Ty10bwg(1)Sa(u) Ea 1.000 258 644 6030 In Sm Rd Sn Sup&Am Tys80(1)Sa(t) Ea 19.000 259 644 6051 In Sm Rd Sn Sup&Am Tys80(2)Sa(p-Exal) Ea 15.000 260 644 6064 In Bridge Mnt Clearance Sgn Assm(Ty n) Ea 27.000 261 644 6066 In Sm Rd Sn Sup&Am (Rail Mount) Ea 8.000 262 644 6067 In Sm Rd Sn Sup&Am (Inst Sign Only) Ea 9.000 263 644 6068 Relocate Sm Rd Sn Sup&Am Ty 10bwg Ea 13.000 264 644 6076 Remove Sm Rd Sn Sup&Am Ea 196.000 265 644 6077 Remove Brdg Mnt Clearance Sign Assm Ea 8.000 266 647 6001 Install Lrss (Struct Steel) Lb 3,325.000 267 647 6002 Relocate Lrsa Ea 10.000 268 647 6003 Remove Lrsa Ea 17.000 269 650 6027 Ins Oh Sn Sup(25 Ft Cant)(Span Only) Ea 3.000 270 650 6041 Ins Oh Sn Sup(35 Ft Cant)(Span Only) Ea 1.000 271 650 6048 Ins Oh Sn Sup(40 Ft Cant)(Span Only) Ea 12.000 272 650 6054 Ins Oh Sn Sup(45 Ft Brdg) Ea 1.000 273 650 6096 Ins Oh Sn Sup(85 Ft Brdg)(Span Only) Ea 1.000 274 650 6101 Ins Oh Sn Sup(90 Ft Brdg)(Span Only) Ea 1.000 275 650 6111 Ins Oh Sn Sup(100 Ft Brdg)(Span Only) Ea 1.000 276 650 6116 Ins Oh Sn Sup(105 Ft Brdg)(Span Only) Ea 6.000 277 650 6131 Ins Oh Sn Sup(120 Ft Brdg)(Span Only) Ea 1.000 278 650 6141 Ins Oh Sn Sup(130 Ft Brdg)(Span Only) Ea 2.000 279 650 6204 Remove Overhd Sign Sup Ea 17.000 280 658 6001 Instl Del Assm (d-Sw)Sz 1(Flx)Gnd Ea 23.000 281 658 6014 Instl Del Assm (d-Sw)Sz (Brf)Ctb (Bi) Ea 8.000 282 658 6018 Instl Del Assm (d-Sy)Sz 1(Flx)Gnd Ea 5.000 283 658 6047 Instl Om Assm (Om-2y)(Wc)Gnd Ea 18.000 284 658 6050 Instl Om Assm (Om-2z)(Flx)Srf Ea 43.000 285 658 6058 Instl Om Assm (Om-3c)(Flx)Srf Ea 5.000 286 658 6063 Instl Del Assm (d-Sw)Sz 1(Brf)Gf2(Br) Ea 22.000 287 658 6065 Instl Del Assm (d-Sy)Sz 1(Brf)Gf2(Br) Ea 29.000 288 658 6069 Instl Del Assm (d-Sw)Sz (Brf)Ctb (Br) Ea 409.000 289 658 6070 Instl Del Assm (d-Sy)Sz (Brf)Ctb (Br) Ea 620.000 290 662 6060 Wk Zn Pav Mrk Remov (w)4"(Brk) Lf 83,695.000 291 662 6061 Wk Zn Pav Mrk Remov (w)4"(Dot) Lf 641.000 292 662 6063 Wk Zn Pav Mrk Remov (w)4"(Sld) Lf 272,617.000 293 662 6070 Wk Zn Pav Mrk Remov (w)8"(Lndp) Lf 10,235.000 294 662 6071 Wk Zn Pav Mrk Remov (w)8"(Sld) Lf 54,312.000 295 662 6075 Wk Zn Pav Mrk Remov (w)24"(Sld) Lf 378.000 296 662 6080 Wk Zn Pav Mrk Remov (w)(Arrow) Ea 66.000 297 662 6090 Wk Zn Pav Mrk Remov (w)(Word) Ea 45.000 298 662 6095 Wk Zn Pav Mrk Remov (y)4"(Sld) Lf 273,285.000 299 666 6006 Refl Pav Mrk Ty i (w)4"(Dot)(100mil) Lf 539.000 300 666 6033 Refl Pav Mrk Ty i (w)8"(Lndp)(100mil) Lf 1,509.000 301 666 6036 Refl Pav Mrk Ty i (w)8"(Sld)(100mil) Lf 44,807.000 302 666 6039 Refl Pav Mrk Ty i (w)12"(Lndp)(100mil) Lf 2,447.000 303 666 6042 Refl Pav Mrk Ty i (w)12"(Sld)(100mil) Lf 12,177.000 304 666 6048 Refl Pav Mrk Ty i (w)24"(Sld)(100mil) Lf 4,295.000 305 666 6054 Refl Pav Mrk Ty i (w)(Arrow)(100mil) Ea 135.000 306 666 6057 Refl Pav Mrk Ty i(w)(Dbl Arrow)(100mil) Ea 53.000 307 666 6063 Refl Pav Mrk Ty i(w)(Uturn Arw)(100mil) Ea 26.000 308 666 6072 Refl Pav Mrk Ty i(w)(Lndp Arw)(100mil) Ea 12.000 309 666 6078 Refl Pav Mrk Ty i (w)(Word)(100mil) Ea 173.000 310 666 6138 Refl Pav Mrk Ty i (y)8"(Sld)(100mil) Lf 519.000 311 666 6147 Refl Pav Mrk Ty i (y)24"(Sld)(100mil) Lf 324.000 312 666 6224 Pavement Sealer 4" Lf 113,709.000 313 666 6225 Pavement Sealer 6" Lf 178,614.000 314 666 6226 Pavement Sealer 8" Lf 46,835.000 315 666 6228 Pavement Sealer 12" Lf 14,624.000 316 666 6230 Pavement Sealer 24" Lf 4,619.000 317 666 6231 Pavement Sealer (Arrow) Ea 135.000 318 666 6232 Pavement Sealer (Word) Ea 173.000 319 666 6234 Pavement Sealer (Dbl Arrow) Ea 53.000 320 666 6236 Pavement Sealer (Uturn Arrow) Ea 26.000 321 666 6237 Pavement Sealer (Lndp Arrow) Ea 12.000 322 666 6300 Re Pm w/Ret Req Ty i (w)4"(Brk)(100mil) Lf 23,215.000 323 666 6303 Re Pm w/Ret Req Ty i (w)4"(Sld)(100mil) Lf 47,342.000 324 666 6306 Re Pm w/Ret Req Ty i (w)6"(Brk)(100mil) Lf 33,927.000 325 666 6343 Ref Prof Pav Mrk Ty i(w)6"(Sld)(100mil) Lf 70,690.000 326 666 6345 Ref Prof Pav Mrk Ty i(y)4"(Sld)(100mil) Lf 42,614.000 327 666 6347 Ref Prof Pav Mrk Ty i(y)6"(Sld)(100mil) Lf 73,997.000 328 668 6115 Prefab Pav Mrk Ty c (Multi) (Shield) Ea 25.000 329 672 6008 Refl Pav Mrkr Ty i-r Ea 252.000 330 672 6010 Refl Pav Mrkr Ty Ii-c-r Ea 6,114.000 331 677 6001 Elim Ext Pav Mrk & Mrks (4") Lf 112,860.000 332 677 6003 Elim Ext Pav Mrk & Mrks (8") Lf 2,610.000 333 680 6003 Install Hwy Trf Sig (System) Ea 4.000 334 680 6004 Removing Traffic Signals Ea 5.000 335 680 6011 Install Hwy Trf Sig (Upgrade) Ea 1.000 336 681 6001 Temp Traf Signals Ea 5.000 337 682 6001 Veh Sig Sec (12")Led(Grn) Ea 6.000 338 682 6002 Veh Sig Sec (12")Led(Grn Arw) Ea 4.000 339 682 6003 Veh Sig Sec (12")Led(Yel) Ea 6.000 340 682 6004 Veh Sig Sec (12")Led(Yel Arw) Ea 4.000 341 682 6005 Veh Sig Sec (12")Led(Red) Ea 6.000 342 682 6006 Veh Sig Sec (12")Led(Red Arw) Ea 2.000 343 682 6018 Ped Sig Sec (Led)(Countdown) Ea 26.000 344 682 6049 Backplate w/Refl Brdr(4 Sec) Ea 2.000 345 682 6050 Backplate w/Refl Brdr(5 Sec) Ea 1.000 346 682 6060 Backplate w/Refl Brdr(3 Sec) Ea 5.000 347 684 6009 Trf Sig Cbl (Ty a)(12 Awg)(4 Condr) Lf 9,769.000 348 684 6012 Trf Sig Cbl (Ty a)(12 Awg)(7 Condr) Lf 10,192.000 349 684 6035 Trf Sig Cbl (Ty a)(14 Awg)(9 Condr) Lf 15,333.000 350 684 6049 Trf Sig Cbl (Ty a)(16 Awg)(3 Condr) Lf 8,399.000 351 684 6080 Trf Sig Cbl (Ty c)(14 Awg)(2 Condr) Lf 9,769.000 352 686 6037 Ins Trf Sig Pl Am(s)1 Arm(36') Ea 1.000 353 686 6219 Ins Trf Sig Pl Am(s)2 Arm(55-40')Lum Ea 1.000 354 687 6001 Ped Pole Assembly Ea 10.000 355 687 6003 Relocate Ped Pole Assembly Ea 3.000 356 688 6001 Ped Detect Push Button (Aps) Ea 38.000 357 688 6003 Ped Detector Controller Unit Ea 6.000 358 690 6065 Replace Of Luminaire Head Ea 4.000 359 700 6003 Pothole Repair (Standard) Ton 100.000 360 730 6106 Strip Mowing Cyc 13.000 361 734 6002 Litter Removal Cyc 38.000 362 740 6004 Anti - Graffiti Coating(Permnent-Ty Ii) Sf 240,307.000 363 780 6002 Cnc Crack Repair (Discrete)(Inject) Lf 168.800 364 780 6006 Cnc Crack Repair (Flood)(Gravity) Sf 7,020.000 365 785 6006 Bridge Joint Repair (Header) Lf 221.000 366 786 6001 Carbon Fiber Reinf Polymer Protection Sf 6,396.200 367 1004 6002 Tree Protection Ac 1.900 368 3076 6001 d-Gr Hma Ty-b Pg64-22 Ton 79,559.200 369 3076 6024 d-Gr Hma Ty-c Sac-a Pg70-22 Ton 34,566.000 370 3076 6066 Tack Coat Gal 28,412.000 371 3077 6033 Sp Mixes Sp-c Sac-a Pg76-22 Ton 89,461.000 372 3077 6034 Sp Mixes Sp-c Sac-b Pg76-22 Ton 4,302.000 373 3085 6001 Underseal Course Gal 150,176.000 374 4002 6001 Replace Elastomeric Bearing Pads Ea 30.000 375 4021 6001 Tip Testing(Drill Shaft) Ea 73.000 376 4171 6001 Install Bridge Identification Numbers Ea 25.000 377 5111 6001 Install Salvaged Fence Lf 252.000 378 5118 6001 Porous Concrete Sidewalks (4") Sy 3,981.000 379 6001 6002 Portable Changeable Message Sign Ea 8.000 380 6004 6031 Its Com Cbl (Ethernet) Lf 682.000 381 6007 6011 Fiber Optic Cbl (Sngle-Mode)(12 Fiber) Lf 3,380.000 382 6007 6017 Fiber Optic Cbl (Sngle-Mode)(144 Fiber) Lf 31,060.000 383 6007 6021 Fiber Optic Splice Enclosure Ea 6.000 384 6007 6023 Fiber Optic Patch Panel (12 Position) Ea 7.000 385 6007 6027 Fiber Optic Patch Panel (144 Position) Ea 4.000 386 6007 6103 Remove Fiber Optic Cable Lf 26,955.000 387 6008 6043 Its Grnd Mnt Cab (Ty 6) (Conf 2) Ea 2.000 388 6010 6002 Cctv Field Equipment (Digital) Ea 5.000 389 6010 6010 Cctv Field Equip (Analog) (Instl Only) Ea 1.000 390 6010 6012 Relocate Cctv Field Equipment Ea 1.000 391 6027 6003 Conduit (Prepare) Lf 3,850.000 392 6027 6007 Manhole (Prepare) Ea 17.000 393 6027 6008 Ground Box (Prepare) Ea 37.000 394 6028 6001 Install Dms (Pole Mtd Cabinet) Ea 3.000 395 6062 6018 Its Radio (Sngl)(5 Ghz)-i-u Ea 13.000 396 6064 6009 Its Pole (20 Ft)(Rem) Ea 1.000 397 6064 6055 Its Pole (60 Ft)(90 Mph) Ea 7.000 398 6064 6080 Its Pole Mnt Cab (Ty 2)(Conf 1) Ea 6.000 399 6064 6082 Its Pole Mnt Cab (Ty 2)(Conf 1)(Rel) Ea 1.000 400 6072 6001 Modular Glare Screens (Furn & Install) Lf 11,400.000 401 6072 6002 Modular Glare Screens (Remove) Lf 11,400.000 402 6093 6004 Remove Existing Communication Cabinet Ea 24.000 403 6093 6005 Remove Existing Cctv Field Equipment Ea 5.000 404 6093 6009 Remove Exist Fiber Hub Ea 5.000 405 6093 6010 Remove Exist Fib Opt Dms Sys(Ty-2) Ea 3.000 406 6093 6012 Remove Exist Rvsd Ea 9.000 407 6093 6013 Relocate Exist Fib Opt Dms Sys(Ty-2) Ea 3.000 408 6096 6002 Ins Led Ww Sgn w/Basic Sol Pwr Kit Ea 16.000 409 6123 6001 Ethernet Switch (Install Only) Ea 10.000 410 6124 6001 Mpeg 4 Video Encoder (Install Only) Ea 5.000 411 6125 6001 Terminal Server (Install Only) Ea 6.000 412 6146 6001 Installation Of Bluetooth Reader Ea 4.000 413 6156 6002 Led Hi Mst Il Asm (6 Fixt)(Asym)(Ty a) Ea 14.000 414 6156 6003 Led Hi Mst Il Asm (6 Fixt) (Asym)(Ty b) Ea 16.000 415 6158 6001 Tmsp Radar Speed Control Monitor Ea 2.000 416 6185 6002 Tma (Stationary) Day 1,095.000 417 6186 6002 Its Gnd Box(Pcast) Ty 1 (243636)w/Aprn Ea 56.000 418 6186 6010 Its Gnd Box(Pcast) Ty 2 (366048)w/Aprn Ea 8.000 419 6292 6007 Relocate Rvds Ea 4.000 420 6304 6001 Its Rvsd (Data Collect Only) Sys Ea 7.000 421 6304 6005 Its Rvsd (Dc Only) (Relocate) Ea 1.000 422 6306 6007 Vivds Cabling Lf 3,124.000 423 6307 6002 Temp Speed Monitor (2 Sys) Day 2,264.000 424 6309 6002 Temp Con Equip Alert (2 Sys) Day 2,264.000 425 6344 6002 Temp Travel Time (2 Sys) Day 2,264.000 426 7175 6001 Ngp Main (8" Dia Stl) Lf 40.000 427 7175 6002 Gas Reducer (8" Dia x 6" Dia Stl) Ea 2.000 428 7175 6003 Gas Ell (8" Dia Stl) Ea 4.000 429 7175 6006 Gas Valve (8" Dia Stl) Ea 2.000 430 7175 6007 Gas Valve Box Ea 2.000 431 7175 6008 Ngp Stopple Ea 4.000 432 7175 6009 Removal Lf 886.000 433 7175 6015 Ngp Main (4" Dia Pe) Lf 35.000 434 7175 6016 Gas Ell (4" Dia Pe) Ea 3.000 435 7175 6017 Gas Cap (4" Dia Pe) Ea 1.000 436 7175 6018 Gas Tee (4" Dia x 4" Dia Pe) Ea 1.000 437 7175 6024 Poly Tie-In Ea 3.000 438 7175 6027 Gas Casing (8" Dia Stl) Lf 855.000 439 7175 6029 Ngp Main (8" Dia Pe) Lf 35.000 440 7175 6030 Gas Ell (8 Dia Pe) Ea 4.000 441 7175 6036 Ngp Casing (12" Dia Stl) Lf 35.000 442 7175 6037 Ngp Insert (4" Dia Pe) Lf 835.000 443 7175 6038 Gas Tee (6" Dia x 6" Dia Stl) Ea 2.000 444 7175 6039 Ngp (Boring) (8" Dia Stl) Lf 835.000 445 7186 6003 Ngp (Main) (6" Plastic w/Tw) (Open Cut) Lf 88.000 446 7186 6007 Ngp Adjust Gas Facility Access Cover Ea 7.000 447 7186 6012 Ngp (Main)(8" Steel)(Open Cut) Lf 75.000 448 7186 6026 Ngp (Remove Abandoned Main)(6") Lf 141.000 449 7186 6027 Ngp (Remove Abandoned Main)(8") Lf 30.000 450 7186 6033 Ngp (Main) (12" Steel) (Open Cut) Lf 12.000 451 7186 6034 Ngp (Main) (16" Steel) (Open Cut) Lf 4,917.000 452 7186 6035 Ngp (Remove Abandoned Main) (12") Lf 3,395.000 453 7186 6036 Ngp (Grout Abandoned Main) (12") Lf 1,441.000 454 7194 6001 San Swr Trench Excavation Protection Lf 74.000 455 7194 6008 San Swr Flowable Fill Cy 45.000 456 7194 6018 Existing Manhole Adjustments Ea 2.000 457 7194 6029 Concrete Saddle Cy 25.000 458 7196 6001 Trench Excavation Protection Lf 565.000 459 7196 6002 Ductile Iron Fittings Ton 2.600 460 7196 6005 Flowable Fill Backfill Cy 405.000 461 7196 6011 Adjust Valve Box Ea 33.000 462 7196 6012 Concrete Saddle Cy 197.000 463 7196 6031 New Meter Box Ea 4.000 464 7196 6042 Relocate Fire Hydrant Ea 9.000 465 7196 6068 Adjust Meter Box Ea 4.000 466 7196 6089 Pipe Water Main (Pvc) (18") Lf 56.000 467 7196 6090 Gate Valve And Box (Complete) (18") Ea 9.000 468 7196 6091 Concrete Cradle Cy 6.000 469 7202 6008 Strmwtr Treat Unit (96in) (8 Cartridge) Ea 2.000 470 7202 6010 Strmwtr Treat Unit (144 In) (31 Cart) Ea 2.000 471 7202 6011 Strmwtr Treat Unit (144 In) (32 Cart) Ea 2.000 472 7202 6012 Strmwtr Treat Unit (8'x8')(4 Cartridge) Ea 1.000 473 7202 6014 Strmwtr Treat Unit (8'x8')(6 Cartridge) Ea 1.000 474 7202 6017 Strmwtr Treat Unit (8'x12')(20 Cart) Ea 1.000 475 7202 6018 Strmwtr Treat Unit (72 In)(4 Cartridge) Ea 3.000 476

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents