Similar Projects
Modular Building Systems for School Cafeterias and Dining Halls
Term Contract
Bidding
Taylorsville, UT 84129

Sunrise Elementary Office Remodel
Post-Bid
Sandy, UT 84092

Office Remodel - Granite Elementary
Renovation
Post-Bid
Sandy, UT 84092

Oakdale Elementary Office Remodel
Results
Sandy, UT 84093

Construction Gourley Elementary, Accessibility Remodel
Renovation
Results
Kearns, UT

Edison Elementary School, Phase-2
Construction
Salt Lake City, UT

Midvalley Elementary School
Construction
$18,000,000 est. value
Midvale, UT

New K-5 Elementary School - Ellis Elementary School
New Construction
Post-Bid
Logan, UT 84321

Construction Security Remodels at 4 Elementary Schools
Renovation
Results
West Valley City, UT

CM/GC South Kearns El. Replacement
Construction
Salt Lake City, UT 84119

Jordan Ridge Elementary Remodel - Part II
Renovation
Post-Bid
South Jordan, UT 84095

Lighting Upgrade for Pioneer Elementary
Results
West Valley City, UT 84119

Subcontractors for South Kearns Elementary Rebuild
Renovation
Construction
Kearns, UT 84118

CAB - Concrete Repair and EIFS Replacement
Post-Bid
Sandy, UT 84070

Pre-Qualification of General Contractors - Part I
Results
West Jordan, UT

Reported 03/27/2019 03:20 PM
Project Title

Multi-Step Bid for West Jordan Elementary 6

Physical Address View project details and contacts
City, State (County) West Jordan, UT 84081   (Salt Lake County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method
Project Status Construction Commenced March 2019
Bids Due View project details and contacts
Estimated Value Less than $20,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description 1. Approximately 8800 South 6400 West, in West Jordan, Utah 2. Single story elementary school on 12 acres 3. Load bearing masonry 4. Base bid 75,275 sq. ft. 5. Deductive alternate #1 Remove 2 classrooms and collaboration area 3,910 sq. ft. 6. Deductive alternate #2 Remove 2 classrooms and collaboration area 3,910 sq. ft. 7. Construction timeline- April 1, 2019 with substantial completion July 1, 2020
Details
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents