Similar Projects
RFQ Construction Manager - Construction Management Services New PreK - 5 Elementary School
New Construction, Infrastructure
Conception
$46,600,000 CJ est. value
Madison, CT 06443

Bucks Hill School Roof Replacement - City of Waterbury
Renovation
Conception
$1,900,000 CJ est. value
Waterbury, CT 06704

RFQ Construction Manager at Risk - Construction Manager at Risk for the new Madison Elementary School
New Construction, Infrastructure - 87,500 SF
Design
$61,100,000 CJ est. value
Madison, CT 06443

Structural Bracing of School Basement Wall
Renovation
Bidding
$20,000 CJ est. value
Waterbury, CT 06710

Washington Elementary School Architectural Services
New Construction - 69,064 SF
Post-Bid
$31,912,884 to $38,803,926 est. value
West Haven, CT 06516

Bradley Elementary School Restroom Renovations
Renovation
Post-Bid
Derby, CT 06418

Main Entryway Improvements
Renovation
Results
$953,500 est. value
Cheshire, CT 06410

Melissa Jones Elementary School Elevator Replacement
Results
Guilford, CT 06437

Sprague School Roof Replacement - City of Waterbury
Build-out
Conception
$1,200,000 CJ est. value
Waterbury, CT 06704

Irving Elementary School Restroom Renovations
Renovation
Post-Bid
Derby, CT 06418

Entrance Upgrades at Live Oaks Elementary School
Renovation
Results
Milford, CT 06460

Addition, Alterations, Renovations, Security Upgrades and Code Compliance Project at Pumpkin Delight Elementary School
Renovation, Addition
Post-Bid
Milford, CT

Toilet Room Upgrades at Doolittle Elementary School
Renovation
Results
Cheshire, CT 06410

Construction Management Services for Washington Elementary School
New Construction - 56,368 SF
Post-Bid
West Haven, CT 06516

District Outdoor Pavilions Construction Services
Infrastructure
Results
$203,700 CJ est. value
Bethany, CT 06524

Last Updated 08/22/2022 06:32 PM
Project Title

Hopeville School Roof Replacement - City of Waterbury

Physical Address View project details and contacts
City, State (County) Waterbury, CT 06706   (New Haven County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids
Project Status Construction start expected March 2027
Bids Due View project details and contacts
Estimated Value $950,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope of work has not been determined. As of August 22, 2022, this project is currently in the FY 2023-2027 CIP and funding is allotted for FY 2026. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents