Similar Projects
Deseret Peak Pool Heaters
Alteration
Bidding
Grantsville, UT 84029

Building 587 Boiler Replacement
Term Contract
Bidding
$965,856 est. value
Salt Lake City, UT 84132

Mckinley Elementary School Boiler Replacement Project
Post-Bid
Tremonton, UT 84337

On-Call Task Order General Mechanical Construction Services
Term Contract
Post-Bid
Salt Lake City, UT 84114

H344--660 (Con) Engineering- Boiler 3Rd Party Inspection, Start-Up And Testing Services For 660-17-100 New Boiler Installation At The George E Wahlen Va Health Care System In Salt Lake City, Ut
Results
Salt Lake City, UT 84148

Canyon View Jr. Boiler Replacement
Results
Orem, UT 84097

Windsor Elementary School - Mechanical Upgrade
Alteration
Bidding
Orem, UT 84057

2020 Dive and Splash Pools Boiler Replacement
Post-Bid
Kearns, UT 84118

Dfcm Construction-Pre Qualified Mechanical-Snow College Noyes Bldg. Chiller Replacement-21016700
Results
Less than $367,000 est. value
Ephraim, UT

East Transportation Building - Mechanical Upgrade
Alteration
Bidding
American Fork, UT 84003

2020 Replaster of the Outside Dive and Splash Pools
Post-Bid
Kearns, UT 84118

Removal of Existing Swimming Pool Boilers and Installation of New Boilers
Results
Less than $100,000 est. value
Lindon, UT 84042

Freedom Elementary Boiler Replacement
Alteration
Bidding
Highland, UT 84003

Natural Gas Boilers
Post-Bid
Spanish Fork, UT

DFCM Construction-Pre Qualified Mechanical-W Jordan Courts Mechanical System and BAS-18251150
Results
Less than $3,000,000 est. value
West Jordan, UT 84088

Last Updated 02/03/2022 05:15 AM
Project Title

DFCM Construction-Pre-Qualified Mechanical UVU Infrastructure and Computer Science Building

Physical Address View project details and contacts
City, State (County) Orem, UT 84058   (Utah County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will remove and replace the secondary hot water and chilled water pumps located in Central Plants #1 and #2. New VFDS, controls and piping specialties are including in the scope. The work shall be phased between the two plants to maintain control for the campus during this work. Project phasing (phase #1 & #2) is detailed in the drawings. The base bid shall include all work and materials associated with this project.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Packaged Water Chillers, Convection Heating and Cooling Units, Water-to-Water Heat Pumps.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents