Similar Projects
Hot Plant-Mixed Bituminous Courses, Electrical Work, Traffic Signal - SR 25(US441) SW 14th Drive - Traffic Signal
Infrastructure
Bidding
$1,292,733 est. value
FL

SR 802 (Lake Worth Rd)
Infrastructure
Bidding
$10,205,205 est. value
FL

District Five Intersection Detection Equipment
Post-Bid
DeLand, FL

District Five Automated Approach and Detector Channel Prediction And Configuration Service - Traffic Control
Infrastructure
Post-Bid
Deland, FL

Traffic Operations Design-Build Pushbutton
Results

Traffic Operations Design-Build Pushbutton
Results

Lighting / Traffic Signals
Infrastructure
Bidding
$929,791 est. value
Jacksonville, FL

Holmes Beach City Center Roadway Improvements
Infrastructure
Post-Bid
$1,500,000 est. value
Holmes Beach, FL 34217

Babcock/Apollo Mast Arms and PED Improvements
Results
Melbourne, FL 32901

Legacy and Saddlewood Elementary Schools Sidewalk Improvements
Infrastructure
Bidding
$130,000,000 est. value
Ocala, FL 34480

As Needed Maintenance of Traffic (MOT)
Term Contract
Post-Bid
FL

Traffic Control and Utility Box Wraps
Results
Fort Lauderdale, FL 33301

Traffic Signal Preventive Maintenance - North Zone
Infrastructure
Post-Bid
$1,094,000 est. value
FL

Detector Loop Saw Cutting and Installation Services (Sheltered Market Solicitation)
Term Contract
Results
Tampa, FL 33602

Asset Maintenance For Primary Roadways
Infrastructure
Post-Bid
$9,208,100 est. value

Last Updated 05/09/2022 09:35 AM
Project Title

Pepper Tree at US 301 Signalization Project

Physical Address View project details and contacts
City, State (County) FL   (Sumter County)
Category(s) Heavy and Highway
Sub-Category(s) Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,107,400
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will convert an existing no signalized intersection to a signalized intersection. The project will include installing mast arms, signal cabinet and hardware, traffic signals, video detection, turn lane extension, and all other equipment necessary to make the signalized intersection fully operational as identified in the SR 35/US 301 at Pepper Tree Lane/CR 124A signal plans. The project is located at US 301 MP 25.981.

Details

Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents