Similar Projects
Myers Street Sewer Extension
Infrastructure
Design
$50,000 CJ est. value
Eastsound, WA 98245

Myers Street Sewer Extension
Infrastructure
Design
$50,000 CJ est. value
Eastsound, WA 98245

RFQ D/B - I-405, Northeast 85th Street Interchange and Inline BRT Station Project
Infrastructure
Bidding
$210,000,000 CJ est. value
Kirkland, WA 98033

RFQ D/B - I-405, Northeast 85th Street Interchange and Inline BRT Station Project
Infrastructure
Bidding
$210,000,000 CJ est. value
Kirkland, WA 98033

Holliwalk Housing Development
New Construction
Post-Bid
$3,200,000 est. value
Friday Harbor, WA 98250

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

San Juan County Prune Alley Street Improvements
Infrastructure
Results
$3,500,000 to $3,900,000 est. value
Eastsound, WA 98245

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

Water Main Replacement Project
Infrastructure
Results
$750,000 est. value
Friday Harbor, WA

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

First Street Overlay
Infrastructure
Results
$500,000 to $580,000 est. value
Friday Harbor, WA 98250

2022 Western Region Pavement Preservation MATOC
Alteration
Results
$300,000 to $10,000,000 est. value

Ls Resurfacing 1
Term Contract
Results
$997,219,550 est. value

Kinney Way Sidewalk Improvements
Term Contract
Results

Laporte Road Widening at Recent Washout (MP 0.36)
Infrastructure
Results
$8,000 est. value
Eastsound, WA 98245

Last Updated 08/06/2022 07:31 PM
Project Title

Lopez Village Farmers Market

Physical Address View project details and contacts
City, State (County) Lopez Island, WA 98261   (San Juan County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $278,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes gravel roadway shoulder widening, relocation and conversion of the existing roadside ditch into a stormwater biofiltration swale, installation of culvert pipes and fencing, and other work along the east side of Village Road on Lopez Island Estimated Cost: $ 278,000 Time for Completion: 20 working days The County is not holding a pre-bid conference for this project. The project site is open to bidders for inspection. Bid deposit shall be submitted with each bid, either by check or money order, in the amount of 5% of the bid amount, or a bid bond in lieu of deposit. The successful bidder shall provide an executed contract bond for the full contract amount, in accordance with RCW 39.08.010.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents