Similar Projects
CCGA Main Campus Cooling Tower #1 Replacement
Alteration
Bidding
Brunswick, GA

Student Center HVAC Modifications
Alteration
Bidding
Swainsboro, GA 30401

McKendree Elementary School - HVAC and Roof Modifications
Post-Bid
Suwanee, GA 30024

Brookwood High School - HVAC Modifications
Post-Bid
Snellville, GA 30078

HVAC Replacement
Results
Augusta, GA 30904

HVAC On-Call Maintenance Services Countywide
Term Contract
Results
Atlanta, GA 30303

HVAC Gym Renovation and (3) New Outdoor Classroom Pavilions
New Construction, Alteration
Bidding
$600,000 est. value
Chickamauga, GA 30707

HVAC Modifications for South Gwinnett High School
Post-Bid
Snellville, GA 30078

Screven County Elementary School ERV Replacement
Results
Sylvania, GA 30467

HVAC Cooling Tower
Alteration
Bidding
Decatur, GA 30032

Detention Center HVAC Upgrades
Post-Bid
Perry, GA 31069

HVAC Outdoor Air Unit (OAU)
Results
Less than $99,941 est. value
Hamilton, GA

Annual Preventive Maintenance Service Agreement and Repairs on Heating and Air Conditioning Services
Term Contract
Bidding
Augusta, GA

HVAC Filters for Stock
Post-Bid
Fayetteville, GA

District Energy Plant (DEP) 1 Chiller Addition
Results
Less than $3,069,000 est. value
Athens, GA 30605

Last Updated 03/15/2022 10:30 AM
Project Title

Cooler-Freezer Installation - Stewart Middle School

Physical Address View project details and contacts
City, State (County) Douglasville, GA 30134   (Douglas County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To provide, deliver and install a cooler/freezer. Delivery and installation will be made Stewart Middle School, 8138 Malone Street, Douglasville, Ga. 30134. This bid is a turn-key operation to include the removal of the existing walk-in including the floor and refrigeration, moving a water heater including finishing an outside enclosure, installation of cooler/freezer box and floor, refrigeration units, electrical, plumbing, and complete flashing/finishing.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents