Similar Projects
The Copper District Phase II - Force Main Project
New Construction
Design
Clayton, NC

Bear Creek Pump Station Improvements
Renovation
Bidding
$300,000 est. value
Mocksville, NC

Wilson's Mills Pump Station Improvements
Renovation
Bidding
$2,000,000 est. value
Smithfield, NC 27577

The Copper District - Lift Station and Force Main Project - Phase I
New Construction
Sub-Bidding
Clayton, NC

Mallard Creek Water Reclamation Facility Phase I Improvements
Renovation, Infrastructure
Sub-Bidding
$2,000,000 est. value
Charlotte, NC 28262

Sewer Pump Station No. 1 Improvements
Post-Bid
$524,959 est. value
Walnut Creek, NC 27534

French Broad River Intake Pump Station Project
Post-Bid
$10,000,000 to $15,000,000 est. value
Hendersonville, NC 28792

Booster Pump Stations #1 and #2 Rehabilitation Project
Results
Troy, NC 27371

Frances Haven and Farmington Pump Station Decommissioning
Results
Less than $500,000 est. value
Harrisburg, NC 28075

Waxhaw Gravity Interceptor, Pump Station and Force Main
Post-Bid
$6,000,000 to $7,000,000 est. value
Monroe, NC

Wastewater Pump Station and Sewer System Improvements
Results
Grifton, NC 28530

Design Build Services for Mott`s Creek Pump Station Upgrades
New Construction
Post-Bid
Less than $5,900,000 est. value
Wilmington, NC 28412

FY2017 Wastewater System Improvements - Rosewood Mobile Home Park
Results
Lumberton, NC 28359

B9070 Lift Station, Replace Irrigation Pump #1 and Base Elbow
Post-Bid
$25,000 to $100,000 est. value
Cherry Point, NC 28533

Coley Road Lift Station Rehabilitation
Results
Salisbury, NC 28144

Last Updated 04/29/2022 09:05 AM
Project Title

Dogwood Pump Station Replacement

Physical Address View project details and contacts
City, State (County) Forest City, NC   (Rutherford County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $750,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project generally consists of : installation a new submersible sewage pump station, 12” DIP sewer line, abandonment of the existing pumping facility, and all other accessories and appurtenances.

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents