Similar Projects
Water Tower Replacement
Infrastructure
Bidding
$1,649,000 est. value
Cullom, IL 60929

Lisbon Road Water Tower
Infrastructure
Bidding
$400,000 est. value
Morris, IL 60450

Water System Improvements Division 2: Water Tower Rehabilitation
Post-Bid
Blue Mound, IL

100,000 Gallon Elevated Tank Rehabilitation
Post-Bid
Marion, IL

New Ground Water Storage Tank
New Construction, Demolition
Results
Loda, IL 60948

Water Storage Tank
Results
Brimfield, IL 61517

750,000 Gallon Spheroid (East Tower - Hickory Creek) Exterior Repaint with Containment Wet Interior Repaint Dry Interior Partial Repaint And Miscellaneous Repairs
Infrastructure, Alteration
Bidding
$400,000 est. value
Mokena, IL

Exterior Protective Coating Restoration
Post-Bid
Wood River, IL

Water System Improvements - Elevated Water Storage Tank
New Construction
Results
Less than $985,000 est. value
De Pue, DePue, IL 61356

Asphalt Sealcoating and Repairs at Raw Water Pump Station, Elevated Tank and Booster Pump Station Facilities
Renovation, Infrastructure
Bidding
$200,000 est. value
Lake Bluff, IL

Fuel Tank Removal and Replacement
Post-Bid
Waukegan, IL 60087

Southwest Tank Rehabilitation
Results
Belvidere, IL

Dodson Water Tower Repair
Renovation
Bidding
$70,000 est. value
Geneva, IL 60134

Underground Storage Tank Fill-In-Place
Post-Bid
IL

Elevated Water Storage Tank
Results
Grayslake, IL

Reported 07/13/2022 12:00 AM
Project Title

Cleaning, Repairing, and Painting the 187th Street Concrete Four Million Gallon Water Storage Tank

Physical Address View project details and contacts
City, State (County) Mokena, IL 60448   (Will County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

For cleaning, repairing, and painting the 187th Street Concrete Four Million Gallon Water Storage Tank. Contractor shall be required to pay no less than prevailing wage rates on the project as established by the United States Department of Labor and the State of Illinois Department of Labor.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents