Similar Projects
Oaktown Storm Water Drainage System Improvement
Bidding
Oaktown, IN

Trinity Storm Water Park Phase II
Bidding
$8,221,000 to $11,714,000 est. value
Evansville, IN

Alexander Street Storm & Sanitary Sewer Installation
Post-Bid
Bremen, IN 46506

Hessen Cassel Storm and Sidewalk Improvements
Post-Bid
Fort Wayne, IN 46800

Grace Street Storm Sewer Improvement
Results
Less than $565,000 est. value
Highland, IN 46322

8th & Ohio Drainage Improvement
Results
Jeffersonville, IN 47130

2020 Guaranteed Savings Contract Provider RFQ
Post-Bid
Muncie, IN 47302

Southeastway Septic System
Results
$70,000 to $80,000 est. value
Indianapolis, IN 46225

Storm Water Improvements
Post-Bid
Coatesville, IN

Lakeside Sewer Relocation
Results
La Porte, IN 46350

Wagner Tile (Upper) Regulated Stormwater Drain Reconstruction Sections 19
Post-Bid
Less than $180,600 est. value
Fort Wayne, Yoder, IN 46798

Montgomery Avenue and Storm Line
Results
$1,000,000 est. value
Clarksville, IN 47129

Lindley Ditch Stormwater
Post-Bid
Huntington, IN

Michigan and Evans Sewer Replacement
Results
Evansville, IN 47708

Graham Street Storm Sewer Replacement
Post-Bid
Franklin, IN 46131

Reported 02/23/2021 12:00 AM
Project Title

Helmsburg Stormwater Improvements

Physical Address View project details and contacts
City, State (County) Nashville, IN 47448   (Brown County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project will be constructed in one (1) contract division which is defined and outlined as follows:The project consists of storm sewer construction on Helmsburg Road, Main Street, 1st Street and2nd Street. The existing storm sewer will be extended along the eastern portion of North Street.Drainage ditch cleaning along with culvert waterjet cleaning on the north side of SR 45 will take place from 2nd Street to Helmsburg School Road. Drainage ditch cleaning will take place on the south side of SR 45 from east of Helmsburg Road to Helmsburg School Road. Several new street inlets are proposed in low areas where ponding occurs

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents