Similar Projects
Canyon Road Sidewalk - 4380 North To Foothill Drive - City Of Provo
Infrastructure
Conception
$250,000 est. value
Provo, UT

Canyon Road Sidewalk - 3450 North to 3540 North - City of Provo
Infrastructure
Conception
$250,000 est. value
Provo, UT 84603

FG Power Plant Parking Lot Retaining Wall
Term Contract
Design
Dutch John, UT

Saratoga Dignity Care Senior Community and Neighborhood
New Construction, Infrastructure
Design
$55,000,000 est. value
Saratoga Springs, UT 84045

2022 - 2024 Trails Projects Prequalification
Term Contract
Bidding
Bountiful, UT

1300 West Street Realingment Project
Infrastructure
Bidding
$400,000 est. value
Pleasant Grove, UT 84062

Panguitch High School South Parking Lot Improvement Package
Post-Bid
Panguitch, UT 84759

300 East - 3900 South to 3970 South
Post-Bid
Millcreek, UT

Parking Structure Demolition and New Construction
Demolition
Results
Ogden, UT

UDOT Burr Trail Turn Lanes
Term Contract
Results
Boulder, UT 84716

Station Park North Site Development
New Construction, Alteration
Construction
Farmington, UT 84025

Dixon Temporary Sidewalk/Path - City of Provo
Infrastructure
Conception
$250,000 est. value
Provo, UT 84601

Riverton High Drivers Ed Canopy
Infrastructure
Bidding
$500,000 est. value
Riverton, UT 84065

BRHS Natatorium Parking Lot Expansion
Post-Bid
Brigham City, Garland, Tremonton, UT 84312

DFCM Construction - VBS Design/Build - WSU Noorda A2 Lot & Paid Parking Lot
Results
Less than $3,308,642 est. value

Last Updated 07/04/2022 12:29 AM
Project Title

DFCM Construction - Southwest Technical College Parking Lot Improvements

Physical Address View project details and contacts
City, State (County) Cedar City, UT 84720   (Iron County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Clearing and Grubbing; Mobilization; 3 Inch Hma Pg 58-28 (1/2" Mix); Sawcutting; Excavation; Excavation - Retention Pond; Untreated Base Course; Granular Borrow; 24 Inch Curb and Gutter; 24 Inch Rolled Curb and Gutter; 6 Inch Curb Wall; Keystone 'compac Tri-plane Series Ii' Retaining; Wall and Footer; Remove Concrete Driveway; 6-inch Reinforced Flatwork; Salvage and Reinstall Bollard; Curb Inlet Box; 12 Inch Ads Pipe - Retention Pond; Irrigation; Landscaping; 48" Chain Link Fence; Pavement Marking Paint; Electrical.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents