Similar Projects
Oakmulgee Ranger District Road Maintenance
Post-Bid
$2,500 to $5,000,000 est. value

On Call Unpaved Streets Maintenance Project
Post-Bid
Saint Marys, GA

Southern Region Disaster Recovery Support BPA
Results

Construction of Keith Dixon Way
Results
Kingsland, GA 31548

T32 - District 5 Routine Maintenance Services
Infrastructure
Post-Bid
Baconton, Evans, GA 30809

St. Marys FY 2020 LMIG Project
Results
Saint Marys, GA 31558

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

Roadway Improvements Field Creek Circle
Results
Woodbine, GA 31569

David L Rainer Elementary School Storage Lanes
Infrastructure
Post-Bid
Kingsland, GA 31548

Asphalt Resurfacing LMIG 2020
Results
Less than $235,543 est. value
Kingsland, GA 31548

Roadway Improvements Planation Point Phase II
Results
Woodbine, GA 31569

1.443 Miles of Widening and Reconstruction for Additional Turn Lanes on SR 40 Beginning West of Grove Blvd (CS 481) and Extending East to Truss Plant Rd (PR 718)
Results

LMIG Street Resurfacing
Results
College Park, GA 30337

Richland Creek Reservoir Entrance
Results
Less than $289,298 est. value
Cartersville, GA 30120

2021 LMIG Project
Results
Mount Vernon, GA

Reported 02/01/2022 03:31 PM
Project Title

Road Resurfacing SPLOST VII 2021

Physical Address View project details and contacts
City, State (County) GA   (Camden County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: Contractor will provide all labor, materials, equipment, and incidentals for roadway resurface and restripe approximately 3.57 miles of roadway surface and some remove and replace areas. Road resurfacing will include asphalt leveling .5” of 9.5mm @ 55# and asphalt overlay will be 1.5” of 12.5mm SP @165#. Remove and replacement includes areas within the limits provided by the Camden County Department of Public Works. Areas are limited to Harrietts Bluff Road west of Interstate 95 to Hwy 17. Striping will consist of thermoplastic 5” single white edge lines and 5” yellow centerlines and skip lines as currently painted. Removal and replacement of existing RPM’s are considered to be incidental to final striping. Temporary paint will be required. Double yellow line 1 mile, single yellow line 1.17 miles, skip lines 2.5 miles.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents