Similar Projects
Miami Freedom Park & Soccer Village
New Construction - 1,000,000 SF
Conception
$1,000,000,000 est. value
Miami, FL

Kendall Town Center
New Construction - 1,174,730 SF
Conception
Miami, FL

One Island Park
New Construction - 123,087 SF
Design
$10,000,000 CJ est. value
Miami Beach, FL

CenterPlace - Master Plan
New Construction - 30,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Fort Myers, FL

Congress Business Park Warehouse
New Construction, Build-Out - 44,500 SF
Bidding by Invitation
$1,000,000 to $5,000,000 CJ est. value
Lake Park, FL 33403

Hallandale Oasis
New Construction, Build-Out - 93,910 SF
Sub-Bidding
$370,000,000 est. value
Hallandale, FL 33009

Courtyard On Main - Phase 1
New Construction, Renovation - 91,000 SF
Post-Bid
$4,500,000 est. value
Dunedin, FL 34698

Redevelopment for Downtown Parcel
Results
De Land, FL

West Water Treatment Plant Lab and Office Space Project
New Construction - 3,000 SF
Results
$1,385,000 est. value
Miramar, FL

The Plaza Coral Gables
New Construction - 2,120,000 SF
Construction
$100,000,000 est. value
Coral Gables, FL 33134

Abacoa Chabad Jewish Center
New Construction - 23,000 SF
Construction
$3,823,130 est. value
Jupiter, FL 33458

Worth It Living Time Share/Vacation Club Community
New Construction
Conception
Kissimmee, FL 324747

Sundy Village - Master Plan
New Construction, Build-Out
Design
Delray Beach, FL 33444

City Center West Orange Master Plan
New Construction
Construction
$150,000,000 est. value
Ocoee, FL 34761

Round Lake Adult Congregate Living Facility
New Construction - 17,600 SF
Conception
Mount Dora, FL 32757

Last Updated 04/16/2020 09:52 AM
Project Title

Copeland Park - Building 1

Physical Address View project details and contacts
City, State (County) Alachua, FL   (Alachua County)
Category(s) Commercial, Laboratory
Sub-Category(s) Laboratory, Office
Contracting Method
Project Status Construction Commenced September 2019, Construction Nearing Completion
Bids Due View project details and contacts
Estimated Value $2,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

25,050 SF - 1 Office, 1 Story Above Grade, 13,300 SF New Construction, 1 Laboratory, 1 Story Above Grade, 11,750 SF New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Rugs and Mats, Office Furniture, Institutional Furniture, Laboratory Furniture.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, HVAC Fans, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents