Similar Projects
Project Silver
New Construction, Infrastructure
Conception
Douglasville, GA

Luella Storage
New Construction, Infrastructure
Conception
$9,000,000 est. value
Locust Grove, GA 30248

Rowen Phase 1 Roads and Infrastructure
Infrastructure
Design
$18,000,000 est. value
Dacula, GA

Blastec - Site Only
Renovation
Design
Cumming, GA 30041

Graham Drive Pump Station Upgrades
Renovation
Bidding
$300,000 est. value
Fairburn, GA 30213

Coastal Pines Technical College Precision Machining & Manufacturing Building
New Construction, Infrastructure
Bidding
$4,000,000 CJ est. value
Kingsland, GA 31548

The Birches on Maple
New Construction, Infrastructure - 148,000 SF
Sub-Bidding
$40,000,000 CJ est. value
Carrollton, GA 30117

Traffic Signal Upgrades
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Atlanta, GA 30309

Lee Street Lift Station and Associated Improvements
Post-Bid
Valdosta, GA 31601

Electric Utility Right-Of-Way Clearing
Term Contract
Post-Bid
Covington, GA

Construction of J.W. Smith Water Production Plant High Service Pump Station Upgrades
Results
Less than $2,746,374 est. value
Hampton, GA 30228

Re-Grading the Existing Gravel Parking Lot at Chattahoochee Pointe Park
Results
$10,000 to $18,000 est. value
Suwanee, GA 30024

Perimeter Marketplace
New Construction - 60,400 SF
Construction
Dunwoody, GA 30338

Construction of Walnut Creek Lift Station
Construction
Morrow, GA 30260

Spela Subdivision
New Construction, Infrastructure
Pending Verification
$100,000,000 CJ est. value
Newnan, GA 30265

Last Updated 07/21/2022 03:09 PM
Project Title

Sewerage System Improvements

Physical Address View project details and contacts
City, State (County) McDonough, GA 30253   (Henry County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $4,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

All Bidders must have a State of Georgia Utility Contractor License and must employ a state Utility Manager certificate holder who will have oversight of all the work. The work to be done consists of furnishing all materials, equipment and labor for the construction of: Approximately 7,800 linear feet 12-inch force main, all complete with appurtenances. Time allotted for construction is 180 consecutive calendar days for substantial completion and 210 days for final completion. Proposals for the complete work in one general contract shall be made on the proposal form provided and shall contain prices in words and figures for the work bid on. All proposals shall be accompanied by a Bid Bond drawn in favor of the City of McDonough, Georgia in the amount of at least 10% of the lump sum bid for the complete work; such Bid Bond representing that the Bidder, if awarded the contract, will promptly enter into a contract and furnish Performance Bond and Payment Bond as provided by law and approved by the Attorney for the City of McDonough, Georgia. Each bond shall be equal to 100% of the contract amount. The Bid Bond shall be forfeited to the City of McDonough, Georgia as liquidated damages if the Bidder fails to execute the contract and provide Performance and Payment Bonds within 10 days after being notified that he has been awarded the contract. The difference between the deposit and the amount refunded represents the cost of reproduction. No refund will be made for documents received after 30 days or in damaged condition. The Owner reserves the right to reject any or all bids and to waive informalities.

Details

Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents