Similar Projects
Parks and Recreation Master Plan - Fort Gratiot Township
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Fort Gratiot, MI 48059

Trench Widening, Pave Shoulders, Shoulder Rumble Strips and Pavement Markings on Marsh Road
Infrastructure
Bidding
$148,000 CJ est. value
Marine City, MI 48039

Trench Widening, Pave Shoulders, Shoulder Rumble Strips and Pavement Markings on Marsh Road
Infrastructure
Bidding
$148,000 CJ est. value
Marine City, MI 48039

2021 Street Improvements
Post-Bid
Yale, MI

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Asphalt Paving Project - Smiths Creek Landfill
Results
Smiths Creek, MI 48074

Economic Development Alliance of St. Clair County New Office Building
Demolition, New Construction, Infrastructure - 14,000 SF
Pending Verification
$4,000,000 CJ est. value
Port Huron, MI 48060

Economic Development Alliance of St. Clair County New Office Building
Demolition, New Construction, Infrastructure - 14,000 SF
Pending Verification
$4,000,000 CJ est. value
Port Huron, MI 48060

Concrete Patches, Sidewalk Ramp Improvements and Railroad Crossing Detour on M-29
Infrastructure
Bidding
$965,000 CJ est. value
Saint Clair, MI 48079

Removal of Thin Epoxy Overlay
Infrastructure
Post-Bid

Cuttle Road Reconstruction Project - Shamrock Lane to Pauls Court
Results
Less than $512,767 est. value
Marysville, MI 48040

King Road Sanitary Sewer
Infrastructure
Bidding
$200,000 CJ est. value
China, MI 48054

Pre Qualified Maintenance - Cold Water Welcome Center-HMA-I-69
Infrastructure
Post-Bid

Robbins Street Road And Water Main Replacement
Results
Algonac, MI

Last Updated 09/29/2022 09:31 AM
Project Title

Krafft Roads and State Roads Roundabout - Saint Clair County

Physical Address View project details and contacts
City, State (County) Fort Gratiot, MI 48059   (Saint Clair County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected March 2026
Bids Due View project details and contacts
Estimated Value $336,441 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a roundabout at Krafft Roads and State Roads Roundabout. As of April 25, 2022, this project is in the conceptual phase. Information regarding a design team and the contractor selection has not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to 2026. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents