Similar Projects
Grand Rapids Heating Upgrade
Bidding
Grand Rapids, MN 55744

Multiple HVAC Equipment Replacement Units
Bidding
Saint Paul, MN 55119

HVAC Filters
Term Contract
Post-Bid
Anoka, MN 55303

MBC - Alerton Controls Services
Term Contract
Post-Bid
Minneapolis, MN

HVAC System Replacement
Results
Grand Rapids, MN 55744

HVAC Upgrades
Results
Minneapolis, MN 55411

Building 25 Dehumidification - Minnesota Veterans Home Hastings
Bidding
$113,270 est. value
Hastings, MN 55033

Filter Replacement Services at PHA Properties
Post-Bid
Saint Paul, MN

Crooked Lake ES HVAC Replacement and Deferred Maintenance Phase 2
Results
Andover, MN 55304

Data Room Cooling at the Judicial Building
Bidding
$103,036 est. value
MN

F108--Chemo Hood Vent Decontamination and Disposal St. Cloud
Post-Bid
Saint Cloud, MN

Johnson High School HVAC Replacement
Results
Saint Paul, MN 55106

Braemar Ice Arena Dehumidification Upgrade
Renovation
Bidding
$240,000 est. value
Edina, Minneapolis, MN

Natatorium HVAC
Post-Bid
Rochester, MN

Franklin Elementary School HVAC Improvements 2020
Results
Mankato, MN 56001

Last Updated 02/17/2021 08:09 AM
Project Title

Chiller Upgrade at MCF - Subbid

Physical Address View project details and contacts
City, State (County) Shakopee, MN   (Scott County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $630,900
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Order any materials required for project completion. 2. Remove existing chiller and cooling tower. Replace with new air cooled chiller and remote evaporator. 3. Remove two existing condenser water pumps and associated piping. 4. Remove two existing chilled water pumps and replace with new pumps. 5. Add chilled water filter separator. 6. Add exhaust fan. 7. Project closeout.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents