Last Updated 03/02/2021 09:49 AM
Project Title

2021 Water Main Replacement and Road Reconstruction Program

Physical Address View project details and contacts
City, State (County) Bloomfield Hills, MI 48304   (Oakland County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Approximately 0.33 miles of water main replacement with road reconstruction, 0.85 miles of roadway pavement replacement by mill and overlay and other miscellaneous items as indicated in the Proposal. Project is located on Rathmor Road and West Valley Road, local streets located on the north side of Wests Long Lake Road, between Lahser Road and Woodward Avenue

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents