Last Updated 05/21/2020 07:43 AM
Project Title

Harvey Channel Recovery Phase II - Stalknecht and Willow Fork

Physical Address View project details and contacts
City, State (County) Brookshire, TX 77423   (Waller County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work under this Contract all work including the following: 1. Installation of construction entrances and Storm Water Pollution Prevention Features 2. Repair of eroded side slopes 3. Excavation for construction of drainage structures 4. Establishment of vegetation in disturbed areas 5. Restoration of all disturbed areas. Including, hydromulch & broadcast seeding. The projects are located in Brookshire-Katy, Texas. Stalknecht is located north of I-10, east of Stalknecht Road and south of Morton Road. Willow Fork is located south of US-90, north of I-10 and east of Igloo Road.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents