Similar Projects
Headquarters Operations Building Renovations
Renovation
Conception
San Jose, CA 95118

Flood Protection - City of San Jose
Infrastructure
Conception
$7,986,000 est. value
San Jose, CA 95134

Icon / Echo
New Construction, Infrastructure - 525,000 SF
Design
$600,000,000 CJ est. value
San Jose, CA 95113

Icon / Echo
New Construction, Infrastructure - 525,000 SF
Design
$600,000,000 CJ est. value
San Jose, CA 95113

De Anza Park Pathway Renovation
Infrastructure
Post-Bid
$546,000 est. value
Sunnyvale, CA 94087

South Loop Project
Infrastructure
Post-Bid
Santa Clara, CA 95134

SCWP - Site Preparation Project
Infrastructure
Results
Sunnyvale, CA

Removal and Replacement of Concrete within the Public Right-Of-Way
Infrastructure
Results
San Jose, CA

Forest Hill Elementary School Phase One
New Construction
Construction
$4,500,000 est. value
San Jose, CA 95130

Kifer Senior Housing
New Construction, Infrastructure
Construction
$13,500,000 CJ est. value
Santa Clara, CA 95051

Eterna Tower
New Construction, Infrastructure - 1,500 SF
Pending Verification
$37,000,000 CJ est. value
San Jose, CA 95113

Hemlock Avenue Mixed Use Development
New Construction, Infrastructure - 11,910 SF
Pending Verification
$24,000,000 CJ est. value
San Jose, CA 95128

Measure T - New Fire Station 36 - City of San Jose
New Construction, Infrastructure
Conception
$11,985,000 est. value
San Jose, CA

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

FMD Ronald M George Elevator Modernization
Renovation
Post-Bid
$3,349,000 est. value
Oakland, San Francisco, San Jose, Santa Rosa, CA 94102

Last Updated 10/26/2022 03:33 PM
Project Title

West Campbell Avenue Offices / Campbell

Physical Address View project details and contacts
City, State (County) Campbell, CA 95008   (Santa Clara County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Misc. Buildings, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $15,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for a new social security administration building. As of October 26, 2022, this project is in the process of getting approvals. An architect has been selected. Information regarding how and when a general contractor will be selected has not yet been confirmed. Construction is estimated to begin summer 2023, at the earliest. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents