Similar Projects
ShipBob Fulfillment Centers Master Plan
New Construction
Conception
Chicago, IL 60607

Retail & Warehouse
New Construction
Conception
Chicago Ridge, IL 60415

Pace Headquarters Salt Shed Installation
New Construction
Bidding
Arlington Heights, IL

Chemical Storage Building for Fox Run Golf Links
Renovation
Bidding
Elk Grove Village, IL

Salt Dome Replacement Facility
Post-Bid
Chicago, IL 60612

NW Wheeling CNG Bus Maintenance and Storage Facility
New Construction
Post-Bid
$40,000,000 est. value
Wheeling, IL 60090

Provide And Install Two Sheds On Concrete Pad
Results
Evanston, IL 60201

Roosevelt And Kostner Development
New Construction
Results
Chicago, IL 60624

Autobarn Subaru Expansion
Addition - 4,923 SF
Construction
Countryside, IL 60525

LogiPark 57-80 Distribution Warehouse
New Construction - 1,200,000 SF
Construction
$10,000,000 CJ est. value
Country Club Hills, IL 60478

Planned Redevelopment
New Construction, Demolition - 825,000 SF
Pending Verification
$10,000,000 CJ est. value
Glenview, IL 60026

Warehouse Distribution Buildings & Associated Office
New Construction - 428,431 SF
Pending Verification
Palatine, IL 60067

Signode Corporate Headquarters
Renovation, Build-Out - 253,000 SF
Conception
$15,000,000 est. value
Elk Grove Village, IL 60007

Public Works Material Storage Building 2
Renovation
Bidding
Berkeley, IL

Salt Storage Dome and Vehicle Storage Building
Demolition
Post-Bid
Less than $800,000 est. value
Chicago, IL 60621

Last Updated 08/11/2021 05:17 PM
Project Title

Amazon Warehouse

Physical Address View project details and contacts
City, State (County) Chicago, IL 60654   (Cook County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Design-Build Firm to Subcontract by Invitation Only.
Project Status Construction Documents, Construction Start Expected second quarter 2021, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Facility to include 15 loading docks as well as landscaped river walk along the length of the South Branch of the Chicago River.

Details

Warehouse/Storage, 112,000 SF New Construction, 449 Parking Spaces.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents